- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水泥仪器操作规程(Rules for operation of cement instruments)
水泥仪器操作规程(Rules for operation of cement instruments) Mixer operation rules of cement paste A, use and operation 1, the power line is plugged into the socket, the red light indicates that the power supply is switched on. The button switch to automatic position, press the small button, automatically complete a slow turn - stop - quick transfer procedures. 2, if the twist open about the manual position, the manual three position switch respectively to complete the action. The handle can be driven to move right and left sliding dovetail guide to stir the pot along the column moves up and down, to stirring for a mobile moving down for under stirring the pot, stir the pot with a skateboard with eccentric rotary locking groove. Two, matters needing attention The working gap between the 1, the stirring vane and the mixing pot should be 2 + 1mm. 2, after each use should be completely removed and the stirring blade paste and stir the pot inside and outside the residual cleaning scattered and fly in and the mortar and in dry matter, a shield, placed into the dust. 3, when the machine is running as a metallic noise, should first check the gap between the stirring blade and the stirring pot is correct. 4, the use of mixing pot to light light, can not arbitrarily break, to prevent deformation of the pot. Reyes boiling box procedures A, use and operation 1, the boiling water tank to water requirements. The four core is inserted into the socket on the controller program. 2, connect the power indicator light. 3, the machine set signal procedures, according to the working button to start warming up apparatus. 4, after completion of the test instrument to stop working, turn off the power switch, release the water about 5 minutes later, the box cover is cooled to room temperature when the sample was taken out to be inside open, residual water natural evaporation and then covered with the lid of a box. Two, matters needing attention 1, the water is generally 180mm, the instrument should
您可能关注的文档
- 心理组训工作计划(Psychological training program).doc
- 心理定律 765人生论坛(The law of mind 765 Life Forum).doc
- 心理自测表(Psychological self test table).doc
- 心理问卷调查题目(Psychological questionnaire).doc
- 心理健康与心理调适试卷.doc(Mental health and psychological adjustment test paper.Doc).doc
- 思修认识(Reflection and understanding).doc
- 态度决定一切(Attitude is everything).doc
- 心理教育试题(Psychological education examination questions).doc
- 思想决定人生(Thinking determines life).doc
- 思想汇报--不断努力提高自身修养(Report on your mind - keep trying to improve yourself).doc
- 汪建成 刑事诉讼法再修改过程中需要处理的几个关系(Several relations to be dealt with in the revision of Wang Jiancheng's Criminal Procedure Law).doc
- 水晶虾开缸(Crystal shrimp open cylinder).doc
- 消费心理学色彩如何影响购买决策_互联网的一些事(How to color consumption psychology affected some things _ internet purchase decision).doc
- 沃尔玛呛水后的战略转移(WAL-MART strategic shift after choking water).doc
- 消费者心理活动过程)(Consumer mental activity process).doc
- 消费者对品牌个性认知及其对品牌心理的影响(Consumers' cognition of brand personality and its influence on brand psychology).doc
- 消防管道施工的质量控制(Quality control of fire fighting pipeline construction).doc
- 消除面板的黄灯(Remove yellow light from panel).doc
- 泰柏板工程的施工组织及方法(The construction organization taiboslab project and method).doc
- 添加城堡(Add Castle).doc
文档评论(0)