市政管网设计规范(Code for design of municipal pipe network).doc

市政管网设计规范(Code for design of municipal pipe network).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
市政管网设计规范(Code for design of municipal pipe network)

市政管网设计规范(Code for design of municipal pipe network) 1. water supply pipe with HDPE pipe. 2. to the sluice valve installation see standard atlas of Su S01-2004-14. Water meter installation see standard atlas of Su S01-2004-31. 3. outdoor fire hydrant installation see GB Atlas 01S201. 4.: water supply pipe pressure test after installation, should be in accordance with the requirements of acceptance specification of 1.4MPa hydrostatic testing. 5. water supply pipes and drainage pipeline if self cross collision or other large diameter, bent by colliding with a water supply pipeline; if the cross wire pipe, bend through. 6. water supply pipeline by excavation of buried pipe foundation encountered in soft soil foundation treatment need to do another, generally located in the 20cm sand or stone dust leveling layer at the end of the pipe. The pipeline is installed in the hard ground water tube on both sides in the pit backfill sand or stone dust, water and solid. On both sides of the green pit underground water pipe pipe and pipe surface backfill should be stratified compaction, compaction shall be not less than 93%. Implementation of code of acceptance of construction quality of water supply drainage and heating engineering GB50242-2002. 7.: rain, sewage drainage pipe pipe HDPE pipe. 8. rain, sewage pipeline backfill foundation and see Su S01-2004-77. 9. rain and sewage pipe should be used to flush the top tube method in the manhole. 10. in the pipeline under roadway, pipe roof covering thickness not less than 0.8M, otherwise should be taken to prevent breakage of the pipeline compression technology. 11. see Su S01-2004-140 practices in manholes. 12. sewage inspection wells see Su S01-2004-91 practices. 13. after the completion of construction should be according to the specifications for closed water test. According to the provisions of the 14. water supply and drainage pipeline engineering construction and acceptance of the implementation of standards. The 15. principle

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档