- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
市政管网设计规范(Code for design of municipal pipe network)
市政管网设计规范(Code for design of municipal pipe network)
1. water supply pipe with HDPE pipe.
2. to the sluice valve installation see standard atlas of Su S01-2004-14. Water meter installation see standard atlas of Su S01-2004-31.
3. outdoor fire hydrant installation see GB Atlas 01S201.
4.: water supply pipe pressure test after installation, should be in accordance with the requirements of acceptance specification of 1.4MPa hydrostatic testing.
5. water supply pipes and drainage pipeline if self cross collision or other large diameter, bent by colliding with a water supply pipeline; if the cross wire pipe, bend through.
6. water supply pipeline by excavation of buried pipe foundation encountered in soft soil foundation treatment need to do another, generally located in the 20cm sand or stone dust leveling layer at the end of the pipe. The pipeline is installed in the hard ground water tube on both sides in the pit backfill sand or stone dust, water and solid. On both sides of the green pit underground water pipe pipe and pipe surface backfill should be stratified compaction, compaction shall be not less than 93%. Implementation of code of acceptance of construction quality of water supply drainage and heating engineering GB50242-2002.
7.: rain, sewage drainage pipe pipe HDPE pipe.
8. rain, sewage pipeline backfill foundation and see Su S01-2004-77.
9. rain and sewage pipe should be used to flush the top tube method in the manhole.
10. in the pipeline under roadway, pipe roof covering thickness not less than 0.8M, otherwise should be taken to prevent breakage of the pipeline compression technology.
11. see Su S01-2004-140 practices in manholes.
12. sewage inspection wells see Su S01-2004-91 practices.
13. after the completion of construction should be according to the specifications for closed water test.
According to the provisions of the 14. water supply and drainage pipeline engineering construction and acceptance of the implementation of standards.
The 15. principle
您可能关注的文档
- 五种全面质量管理思路(Five general quality management ideas).doc
- 五年级班主任工作经验交流材料(Five grade teacher in charge of work experience exchange materials).doc
- 五菱鸿途(Wuling passers hung).doc
- 五险一金缴费比例排行 北京最高(Five social insurance and one housing fund contribution rate ranked highest in Beijing).doc
- 仙剑三-问情篇音乐鉴赏(Legend of three - piece of music appreciation course).doc
- 仙4天河经典台词(Fairy 4 Tianhe classic lines).doc
- 仙剑客栈——地图(Immortal sword inn map).doc
- 仙剑1物品属性及秘籍(Immortal sword 1 items attributes and Cheats).doc
- 仙逆相关句子(Inverse relative sentences).doc
- 享受礼仪(Enjoy the ceremony).doc
最近下载
- 济南版(2024)初中生物学七年级上册《脊椎动物身体背部有脊柱》教学设计及反思.docx
- 中铁建工集团质量管理手册.pdf
- 二级中医医院评审细则解读院感部分.pptx
- 2024年迪瑞医疗分析报告:强化协同,仪器放量布局市场.pdf
- 部编版初中道德与法治九年级上册单元作业设计 (优质案例12页) .pdf
- 广东实验中学2023-2024学年八年级上学期期中考试语文试卷.docx VIP
- 2020年世界发展报告:全球价值链时代的贸易换发展.pdf VIP
- 湖北省水利工程重大设计变更报告编制大纲.pdf
- 2024高中地理教师课程标准考试模拟试卷及参考答案.docx VIP
- 《材料成型工艺学》全套教学课件.ppt
文档评论(0)