- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
图纸会审要点(Drawing points)
图纸会审要点(Drawing points) 1) Pre A audit points Design drawings and specifications are complete, there is no timetable for staging; Size, general layout and construction drawing plane position, elevation is consistent, the Whether the relationship between line drawing, the embedded part is clear; Engineering structure, details, construction methods and technical requirements are clear, and there is no contradiction between the current rules and regulations, whether the economy is reasonable; The quality requirements of building materials and sources are guaranteed; Geological exploration data are complete, ground treatment method is reasonable; Design of seismic intensity in compliance with local requirements; The fire safety requirements are met, there is no public security fire department approval; The construction safety is guaranteed; Indoor and outdoor pipeline arrangement, the elevation is reasonable; The requirements of design drawings and construction site can guarantee construction needs; Engineering quantity calculation is correct; To improve the design and construction of solutions. 2) professional examination Each unit in A. Based on the design requirements, shall organize relevant personnel, professional division of reading documents, further understand the design intent, quality standards and technical requirements; B. According to review the content of the professional, detailed drawings, check the problem, determine the current key. 3) content review A. All units based on professional review on the organization of the professional and technical personnel to discuss, analyze and check between the professional drawings, check each other there is no contradiction, leakage; B. A method is proposed for the treatment, solution or advice; C. Problems and recommendations will be respectively documented, the internal supervision and the Contractor shall triage before by supervisor shall be timely submitted to the design contractor, in order to design the contrac
您可能关注的文档
- 高级英文写作评审课件.ppt
- 高铁运行调度系统.ppt
- 魅力线.doc
- 魔方方面的问题.ppt
- 魔术专题.doc
- 魔术协会新规划书.doc
- 高速摄像机的发展和未来的应用.pdf
- 魔术师正在空中玩耍.doc
- 魔术世界课程计划.doc
- 魔术师的地毯探索.doc
- 图论与网络流理论(Graph theory and network flow theory).doc
- 土体工程地质层组及其特征(Stratum and characteristics of soil engineering geology).doc
- 图的邻接矩阵(adjacency matrix).doc
- 土力学0(Soil mechanics 0).doc
- 土地、空气、水资源的环保措施(Environmental protection measures for land, air and water resources).doc
- 四川话等级考试(Sichuan dialect examination).doc
- 土地使用权和商品房产权(Land use right and commodity house property right).doc
- 土地分区利用原理(Principle of land use zoning).doc
- 土地使用年限暗藏猫腻(Land use years hidden tricky).doc
- 土地利用覆盖(Land use cover).doc
文档评论(0)