ppp状态转移(PPP state transition).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ppp状态转移(PPP state transition)

ppp状态转移(PPP state transition) Yesterday chat, we should structure on the PPP frame has a basic understanding, which in the frame structure, we will see a protocol field, respectively C02100218021 three code, in fact, this different code represents the current frame in the PPP state, we have the following 5 states PPP chat chat the. First, please look at the PPP status transition diagram in the attachment First, the two sides are in the link is not available, then there will be a proposed link request, if you want to establish point-to-point communication through PPP protocol, no matter which side of the equipment are required to send LCP data packets to configure the link, once the LCP configuration parameter option negotiations after the two sides would pass the letter according to the LCP configuration request authentication configuration parameter option in the negotiation message to determine link equipment using authentication method. The two sides is not the default protocol for authentication, and direct access to the NCP configuration option agreement, several configuration process experienced until completion, both to point to begin transmitting data packets through the network layer has an established link, the link will be available. Only when any end receives LCP or NCP link close message (in general agreement is not required on the road capacity of NCP closed, so normally closed data link message is issued in LCP negotiation phase or application session stage); the physical layer can not be detected by the carrier or the management of the link the closing operation, the link will disconnect, thereby terminating the PPP session. The following is a status transition diagram of the PPP protocol that needs to be experienced throughout the link process: PPP needs to go through the following phases during the configuration, maintenance, and termination of the point to point link: Link unavailability phase. Sometimes referred to as the physical layer unavailab

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档