混凝土道路施工方案_(The construction scheme of concrete road _).doc

混凝土道路施工方案_(The construction scheme of concrete road _).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土道路施工方案_(The construction scheme of concrete road _)

混凝土道路施工方案_(The construction scheme of concrete road _) 1, mixture using Xuzhou model is LTU125 type automatic leveling asphalt paver (maximum paving width 12.5m), for full width paving and scraping. When the paver is automatic, the height of the spreading layer is controlled by the reference line formed by the metal side pile and the hanging steel wire. The horizontal slope is controlled by the cross slope controller, and the accuracy is in the range of + 0.1%. 2, when paving, asphalt mixture must be slow, uniform, continuous, spreading shop. Do not arbitrarily change speed or pause halfway. Paving mixture machine screw feeder in keeping the height of not less than 2 / 3 of the height of the feeder. And ensure that the paver on the full width of the section does not occur segregation. 3. The paving of the mixture is done with a domestic paver, and the reference line is used to control the elevation of the paving layer. 4, the transverse seams between the two floors should be staggered over 50cm. 5. In the place where the machinery can not be paved and repaired, artificial paving and refurbishing can be done with the consent of the supervising engineer. 6. During the construction schedule, asphalt mixture paving shall not be carried out when the temperature is below 10. (two) rolling? 1. Once the asphalt mixture is paved and leveled and irregular surface is trimmed, the material is compacted evenly and immediately. 2, the initial pressure in the mixture after paving high temperature, asphalt mixture should not be less than 120 degrees, can not produce passage, crack. The 14T double roller vibratory roller (wheel width 2.16m) is used to crush the wheel when it is rolled. The driving wheel shall be facing the paver, and the rolling route and the direction of rolling shall not be changed suddenly. The initial pressure shall be two times times. ? 3, followed by pressure to initial pressure in asphalt mixture, not less than 90 DEG C, the complex pressure type LY25 tyre ro

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档