安全员考试(Exam security officer).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安全员考试(Exam security officer)

安全员考试(Exam security officer) Selected examination questions for safety officer in 2010 (remarks) this question is for reference only and has no relation to the unified examination First, 2010 Security Officer Exam Questions - Judgment 1. environmental factors that affect the quality of the project include engineering environment, engineering management environment and labor environment. () 2., visual inspection of the means can be summarized as see, touch, knock, four words. () 3. earth moving machinery should be operated at low speed near the ditch and trough. In operation, the pipeline and structure shall be avoided, and the safety distance not less than 1.5m shall be maintained at the edge of the ditch and trough. () 4. for all the explosive blast rock must be by the person in charge of transport. () 5. all falling objects in the construction site shall be removed or fixed in advance. () 6. ladders are not allowed to be lengthened, but they can be used high. () 7., the construction of the stairs and staircases must be installed on the formal protection railings. The top floor should be equipped with temporary guardrail along with the progress of the project structure. () 8. the length of the rod head extension fastener edge shall not be less than 50mm when installing the fastener. () 9. elevator derricks shall only be constructed with steel tubes. () 10. 2m from the ground above the frame, pouring concrete lintel, awning and a small platform, should set up the operating platform, does not directly support the template or stand in operation. () 11. installation of beam, balcony, awning and cornice template, template support as a system, not overlapping in construction scaffolding. () 12. the construction plan of formwork should include the design of formwork and support. Manufacturing, installation, demolition of the construction process. Operating conditions, transportation, storage requirements, etc. () 13. the cable line can be laid on grounds or overhead, or a

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档