- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
轻钢龙骨吊顶施工工艺(Construction technology of light steel keel ceiling)
轻钢龙骨吊顶施工工艺(Construction technology of light steel keel ceiling) (1) materials Various material levels, specifications and fittings shall comply with the design requirements. All kinds of materials shall have product quality inspection certificate and relevant technical data. All materials transport approach not free throw, rattling, prevent trampling, piling up Pingzheng; prevent material deformation, damage, pollution, defect. (2) working conditions; First of all, should be familiar with drawings, materials used, construction tools, engineering quantity, labor force, construction processes, site conditions, duration, etc.. The original information of the building should be complete. The proportion of all the adhesives prepared on the spot shall be tested by the relevant departments before the test is qualified. Before the construction of the ceiling, it should be completed after the completion of the previous process. The original hole should be filled intact without fracture and leakage. The original (buried) suspender shall be in line with the design requirements. The quality of the pipelines installed in the above process shall be checked and accepted; the reserved outlet shall be in accordance with the design elevation of the suspended ceiling. 2. operation process (1) keel installation; According to the design elevation of ceiling requirements, in the wall around the bomb line, the line should be clear, the level of allowable deviation of 15 mm. According to the design requirements, the hanging point coordinate position of the boom is determined. At the end of the main keel hanging from the wall side should not exceed 300 mm. When the main keel is finished, the position and elevation should be corrected as a whole. And should be in the middle, according to the provisions of the arch. The camber shall be no less than 1/200. of the short span of the room All kinds of metal keel, need to connect, should use the same model, brand connection parts, such as the prod
您可能关注的文档
- 绿墙保养方案(Green wall maintenance program).doc
- 绿色建筑(Green Architecture).doc
- 绿谷光电推动led洗墙灯,投光灯发展的战略选择(附图)(Green Valley drive LED wash wall lamp photoelectric, light development strategy (Figure)).doc
- 绿茶是未经发酵的(Green tea is not fermented).doc
- 绿茶饮用方法(Green tea drinking method).doc
- 综合仿生设计在现代工业设计中的应用)(Application of integrated bionic design in modern industrial design).doc
- 缘分的英文表达(The English expression of fate).doc
- 缩小数据文件尺寸报ora-03297的处理办法(How to reduce the size of data files and report ora-03297).doc
- 缩短win7程序响应时间(Shorten the win7 program response time).doc
- 缩短期刊论文发表时滞的意义与途径(Significance and ways to shorten the time lag of periodical publication).doc
- 2023年电大中央银行理论与实务答案.pdf
- 2023年湖北省荆州市特种设备作业移动式压力容器充装R2真题(含答案).pdf
- 2023年河南省漯河市特种设备作业快开门式压力容器操作R1真题(含答案).pdf
- 2023年河南省焦作市特种设备作业安全阀校验F真题(含答案).pdf
- 2023年霍尔果斯经济开发区(市)医疗卫生领域引进高层次紧缺人才笔试真题.pdf
- 2023年河南省周口市特种设备作业安全阀校验F真题(含答案).pdf
- 2023年河南省驻马店市特种设备作业快开门式压力容器操作R1真题(含答案).pdf
- 2023年电大中央银行理论与实务考点.pdf
- 《民航基础英语》(空中乘务专业)课程标准.pdf
- 2023年房产销售工作计划(18篇).pdf
有哪些信誉好的足球投注网站
文档评论(0)