轻钢骨架罩面板顶棚施工工艺标准(914-1996)(Standard for construction of light steel frame panel roof (914-1996)).docVIP
- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
轻钢骨架罩面板顶棚施工工艺标准(914-1996)(Standard for construction of light steel frame panel roof (914-1996))
轻钢骨架罩面板顶棚施工工艺标准(914-1996)(Standard for construction of light steel frame panel roof (914-1996)) This technology standard applies to industrial and civil buildings, suspended ceiling adopts light steel skeleton, install ceiling panel installation project. Construction preparation: 2.1 materials and components: 2.1.1 light steel skeleton is divided into U shape skeleton and T shape skeleton two kinds, and divides according to the load divides the human and not to be human two kinds. 2.1.2 light steel frame main parts are large, medium and small keel; accessories are hanging, connecting parts, hanging plug-in. 2.1.3 spare parts include suspenders, flower basket screws, nails and self tapping screws. The 2.1.4 cover panel shall be selected according to the design requirements, and the varieties, specifications and quality of the material shall comply with the design requirements. 2.1.5 adhesive: should be selected according to the performance of the main adhesive, bonding test before use. 2.2 main machines and tools: 2.2.1 electric saw, toothless saw, nail gun. 2.2.2, a hand plane, pliers, screwdriver, wrench, feet, steel ruler, steel equal. 2.3 operating conditions: 2.3.1 construction, should be in the cast-in-place concrete floor or precast concrete floor slab, according to the design requirements of the embedded space phi 6 Phi 10 steel bars, the general spacing is 900mm, 1200mm. 2.3.2 when the ceiling rooms walls and columns for brick masonry, masonry should be according to the ceiling embedded anticorrosive wood bricks, brick wall spacing of 900mm ~ 1200mm, block in the column on each side should be buried more than two blocks. 2.3.3 after the installation of various pipelines and equipment within the ceiling lights, determined, and all kinds of open vent holes. 2.3.4 all kinds of materials are fully equipped. 2.3.5 ceiling cover panel should be finished before the wall and ground wet operation project. 2.3.6 pitched roof construction operating table shelf. 2.3.7 c
您可能关注的文档
- 维生素c六大功能(Six major functions of vitamin C).doc
- 绿墙保养方案(Green wall maintenance program).doc
- 绿色建筑(Green Architecture).doc
- 绿谷光电推动led洗墙灯,投光灯发展的战略选择(附图)(Green Valley drive LED wash wall lamp photoelectric, light development strategy (Figure)).doc
- 绿茶是未经发酵的(Green tea is not fermented).doc
- 绿茶饮用方法(Green tea drinking method).doc
- 综合仿生设计在现代工业设计中的应用)(Application of integrated bionic design in modern industrial design).doc
- 缘分的英文表达(The English expression of fate).doc
- 缩小数据文件尺寸报ora-03297的处理办法(How to reduce the size of data files and report ora-03297).doc
- 缩短win7程序响应时间(Shorten the win7 program response time).doc
有哪些信誉好的足球投注网站
文档评论(0)