石灰改善土灰剂量衰减曲线探索与思考(Lime improved soil lime attenuation and exploration thinking curve).docVIP
- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
石灰改善土灰剂量衰减曲线探索与思考(Lime improved soil lime attenuation and exploration thinking curve)
石灰改善土灰剂量衰减曲线探索与思考(Lime improved soil lime attenuation and exploration thinking curve) Exploration and thinking of lime to improve soil ash dose attenuation curve Andyruina (Jiangxi traffic engineering supervision company, Nanchang 330008) Abstract: through the grey dose measurement in Anhui Province Ma Wu Highway Subgrade of lime improved soil in the construction of the existing value of the dispute caused by the calcium and magnesium content determination and analysis of indoor test changes with time, the dose of lime with time presents new concept of linear attenuation relationship, in order to make the construction time of soil improved by lime and control. To guide the ash dosage of lime soil construction qualified judgement. Key words: road engineering; grey dose measurement and analysis; new concept of linear attenuation of grey dose with time; grey dose determination 0 Preface Ma Wuhu expressway is the main channel of the cities along the Yangtze River in Anhui Province, leading to the developed cities of Jiangsu, Shanghai and so on. It is a big channel to communicate with the southeast coast of China and the midwest. The width of pavement design 28m two-way 4 lane design speed of 120km/h, located in plain and hilly area, the soft soil foundation, the surrounding soil is more expansive soil with high liquid limit, the water content in 18%-25%, can not be used directly as roadbed filler in roadbed, zone 95 should be used only after improvement, according to the design requirements of ash dosage were 5%, 5%, 7%, and 10%, according to the 4 layer construction, each layer thickness is 20cm. 1 lime to improve soil construction requirements 1.1 raw materials Soil: soil construction usually has certain requirements for the soil plasticity index (15-20), should be in between, because the soil plasticity index is bigger, the strength of mixture is also higher, the mixture is easily compacted, but the crushed soil and sandy soil group, no pulverization but difficult co
您可能关注的文档
- 正确的保护笔记本电池的方法(The correct way to protect laptop batteries).doc
- 止损=再生(Stop loss = regeneration).doc
- 武器选择(Weapon selection).doc
- 正确识别五类双绞线(Correct identification of five twisted pair wires).doc
- 欧洲发展可再生能源经验借鉴(Lessons learned from the development of renewable energy resources in Europe).doc
- 武大考博经验(Wuda Kaobo experience).doc
- 模拟人生2攻略(The Sims 2.).doc
- 橡胶油分类用途标准(Standard for classification of rubber oils).doc
- 武汉macbook笔记本电脑专业维修服务商(Wuhan MacBook notebook professional maintenance service provider).doc
- 武汉大学自考本科行政管理专业的考试科目(全部科目)(Examination subjects (all subjects) of the undergraduate administrative administration of Wuhan University).doc
有哪些信誉好的足球投注网站
文档评论(0)