- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MAINTENANCE INSTRUCTIONS BLADDER (维护说明书膀胱)
MAINTENANCE INSTRUCTIONS
BLADDER ACCUMULATORS
General
Hydraulic Accumulators are pressure vessels and may
contain compressed nitrogen gas or hydraulic fluid at
high pressures.
Only qualified personnel should perform
maintenance.
DO NOT weld on the accumulator shell.
Always use DRY NITROGEN for precharging.
Do not use automotive valve cores in place of high
pressure valve cores.
For maximum seal and bladder life, hydraulic fluid
should be kept clean, filtered to 10 micron or less.
HYDRAULIC PRESSURE MUST BE
REDUCED TO ZERO.
VENT all precharge gas prior to disassembly.
NEVER USE AIR OR OXYGEN for precharge
as this may result in an explosion!
PRECHARGING PROCEDURE
ISOLATE, VENT and DRAIN all fluid completely from
accumulator. Only check precharge when fluid
pressure is “0 psi”. Figure 1—Exploded View Bottom Load Assembly
Remove valve guard (8) and valve cap (7) (Figure 1).
Use PacSeal charging and gauging assembly, part
number 40-1618, to check and adjust precharge of the
accumulator.
Before using the assembly, verify that the bleed valve
(E) is closed and the air chuck (A) is turned fully
counter-clockwise (CCW) (Figure 2).
Connect the air chuck (A) to the gas fill valve (4) on the
accumulator.
Connect the hose assembly to the nitrogen bottle, then
connect it to the fill valve (D) on the charging unit.
Depress the valve core by turning the charging valve
clockwise (CW) until it stops (do not over torque).
SLOWLY open the valve on the nitrogen bottle and
allow gas to flow to the accumulator, noting pressure Figure 2—Charging and Gauging Assembly
on the gauge.
Rev B
Tel: 714-529-9495 Fax: 714-529-1366 561 Tamarack Ave, Brea CA USA
Maintenance Instruction
您可能关注的文档
- LMS Imagine.Lab AMESim Powertrain Transmission(LMS想象。).pdf
- LMH1981 MultiFormatVideo Sync Separator (LMH1981 MultiFormatVideo同步分离器).pdf
- LMK00306 3GHz 6Output Differential Clock (LMK00306 3 ghz 6Output微分时钟).pdf
- LNG PUMPS FOR FLOATING UNITS Chicago(LNG泵流动单元芝加哥).pdf
- Load Flow Analysis on IEEE 30 bus System IJSRP(负载在IEEE 30公交系统 IJSRP流分析).pdf
- Load frequency control for interconnected (负荷频率控制相互联系).pdf
- LOBAL REPORT ON TECHNOLOGY AND THE (全球技术和报告).pdf
- LOAD FLOW STUDY IN POWER SYSTEM ethesis(在电力系统ethesis加载流的研究).pdf
- Local Search and Optimization Problems(本地有哪些信誉好的足球投注网站和优化问题).pdf
- LOAD BEARING WALL SYSTEM, DETAIL NUMBER (承重墙系统,详细的数字).pdf
最近下载
- 苏教版五年级上册《我们的大脑》教学设计.docx
- 贵州省2024年高三年级4月适应性考试 地理试卷.docx
- GEUPS维护及故障讲课文档.ppt VIP
- 触摸屏技术的原理及应用.docx VIP
- 路桥施工计算手册.docx
- 年产50吨瑞舒伐他汀钙、5吨匹伐他汀钙、50吨恩格列净、50吨恩格列净中间体EM1、5吨贝曲西班马来酸盐、200吨阿托伐他汀中间体B-4、200吨瑞舒伐他汀中间体D-1等产品项目环境影响报告书.pdf
- 六年级美术上册《劳动最光荣》课件.ppt
- 抖音直播间1000个违禁词(一举夺葵版).docx
- 反渗透法海水淡化产品水水质控制指标及水质调整措施.pdf VIP
- 《论语》论仁、孝、君子、教育.doc
文档评论(0)