Leak Testing Properties W. M. Huitt Co(泄漏测试属性w·m·Huitt有限公司)
P O B o x 3 11 5 4 S t . L o u i s, M O 6 3 1 3 1 - 0 1 5 4
P h o n e : ( 3 1 4 ) 9 6 6 - 8 9 1 9 ~ E – m a i l : w m h u I t t @ a o l . c o m
Determining Code Compliance and Pipe System Leak Testing
by William M. Huitt
(From a paper dated October 4, 2001 in response to leak test questions that were raised on a project)
In determining the leak test requirements for piping systems a governing Code needs to be determined. The
reason being that leak test requirements vary from Code to Code. In a March 12, 2001 letter I wrote, The
difference, and distinction, as to which Code should apply to a particular project lies with the definition and
scope of the project itself. If, with respect to a particular project, the design includes only the installation of
a refrigeration system, B31.5 would apply. If a projects scope of work consists of an office, laboratory,
research facility, or any combination thereof, B31.9 and possibly B31.5 would apply. A laboratory or
research facility might also require fluid services beyond the range limits of B31.9. In that case, B31.3
would be adopted for those services only.
In the case of a process manufacturing facility, B31.3 would be the governing Code. Since B31.3 covers
all piping, B31.5 or B31.9 would not be included, not even necessarily with associated lab, office and
research facilities. The only time B31.5 or B31.9 would become governing Codes, in association with a
manufacturing facility, is if a refrigeration unit, or an office, lab and/or research facility were under a
separate design/construct contract from the process manufacturing facility. Or they were a substantial part
of the overall project.
As an example, project XYZ consists of
您可能关注的文档
- Junction box Welcome to leoch battery!VRLA (接线盒,欢迎来到leoch电池! VRLA).pdf
- KAYAKING Prepared. For Life.174;(皮划艇,准备。).pdf
- Kaydon Bearings Slewing ing earings XR Series(169;Kaydon轴承回转ing耳索XR系列).pdf
- Kaydon Bearings Slewing Ring Bearings (169;Kaydon轴承回转环轴承).pdf
- June 2017 Hang Seng Indexes(2017年6月,恒生指数).pdf
- K.DELIJI]ETAL ...(K。).pdf
- KBK IIH crane construction kit Classic system(经典KBK IIH起重机施工装备系统).pdf
- Keeping Students Engaged Pottsgrove School (让学生参与Pottsgrove学校).pdf
- KB Bus AirConditioner HCVM(KB巴士空调HCVM).pdf
- Kennametal Grade System for Cutting Materials(肯纳公司等级系统,切割材料).pdf
文档评论(0)