墙面瓷砖粘贴(Wall tile paste).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
墙面瓷砖粘贴(Wall tile paste) Operation instruction ---- wall tile sticker I. construction preparation 1. material requirements 1) cement: No. 425 slag cement or ordinary Portland cement. The factory certificate or re examination shall be issued and shall be used in accordance with the test results if the factory has been in production for more than three months. 2) white cement: No. 425 white cement. 3) sand: coarse sand or medium sand, use before screening. 4) brick face: the surface of tile should be bright and clean, square and smooth; the quality is firm, and its varieties, specifications, sizes, colors and patterns should be uniform, and must comply with the design requirements. No defects such as missing beam, falling angle, dark mark and crack. The general energy index shall meet the requirements of the current national standards, and the water absorption rate of glazed tiles shall not exceed 10%. 5) 107 glue and mineral pigment, etc.. 2. main machines and tools 1) 5mm aperture sieve, sieve screens, buckets, wood trowel, iron trowel, bar, ruler, Fang Chi, iron level, ash ash tank, spoon, brush, wire brush, broom, hammer, small white cloth or cotton, silk, steel knife, shovel, small grey stone, pointing Yunji downpipe, line sinkers, ruler box etc.. 3. operating conditions 1) the wall grassroots clean up, window sills, windows and other blocks in advance blocking. 2) according to the size of tile size, color brick selection, and classified storage reserve. 3) large area before construction should first put the sample and make the model to determine the wall, construction technology and operation points, and do the work to the construction personnel. After the completion of the sample wall, the quality inspection departments must be identified, after passing the design, and Party A and construction units jointly identified, can organize teams and groups, in accordance with the requirements of the model wall construction. Two, operation process 1. process Primary trea

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档