线切割分为快走丝与慢走丝,请问这两种加工方法的加工费用如何计算(For wire and wire EDM wire cutting, how to process cost of the two processing methods are calculated).docVIP

线切割分为快走丝与慢走丝,请问这两种加工方法的加工费用如何计算(For wire and wire EDM wire cutting, how to process cost of the two processing methods are calculated).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
线切割分为快走丝与慢走丝,请问这两种加工方法的加工费用如何计算(For wire and wire EDM wire cutting, how to process cost of the two processing methods are calculated) For wire and wire EDM wire cutting, how to process cost of the two processing methods are calculated. Thank you Lvyaosir 2007-03-05, 15:55 General line cutting in general, according to the line cutting area, the workpiece height is also high, the corresponding price will be high The price of silk is around 10 times the ordinary cutting line Mjt1977 2007-03-06, 15:40 Quote: Quoting first floor lvyaosir, published at 15:55 2007-03-05: General line cutting in general, according to the line cutting area, the workpiece height is also high, the corresponding price will be high The price of silk is around 10 times the ordinary cutting line Really? How much is it? Wuqiong 2007-03-13, 22:58 Wire processing in Jiangsu and Zhejiang area generally 60 yuan per hour (the average cutting efficiency of 40-60mm/min), but high precision mold cutting point to 80 yuan, because once the scrap needs to accompany the pay for the price of materials. Zhouke 2007-03-14, 15:31 Processing time calculation: processing section area / (1200-1800) = required time, 1200-1800 is an adjustable parameter, usually take 1500, and then multiplied by the hourly processing fee on it. Im flying with the wind, 2007-03-15 13:26 Fast silk, then some can 0.015 yuan, MM also has 0.005 yuan MM There are also 10 yuan per hour Im flying with the wind, 2007-03-15 13:30 Slow wire cutting machining 0.03MM Wire cut two knife processing 0.038MM Wire cut three knife processing 0.045MM Wire cut four knife processing 0.055MM Momo09 2007-04-05, 14:00 What area does the machining section mean? For example, to cut a mouth, length of 34mm, width of 2mm, cutting depth of 55mm, cross-sectional area refers to the length, width, width, depth? Ask the very food problem, please dont laugh. Xiao Ling, 2007-04-05, 20:34 Our line cutting costs are basically 10 yuan / hour B123 2007-04-05, 20:52 Fast silk

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档