- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
预算题(Budget question) First, individual choice (1 points per game, 30 points) 1. the slab without beam is a plate directly supported on the column, and its concrete volume is calculated according to the sum of the volume of (B). A. plate with column, B. plate with column cap, C. plate with column and column cap, D. plate with plate head 2. reinforced concrete cross beam fixed at both ends of the length of mouth wide with (B) cm. A. 25, B.50, C.100, D.200 3. plastic downpipe (C) in engineering calculation. A. area B., volume C., length D. section 4., the number of cast-in-place reinforced concrete stairs (B) calculation. A. extension meters B. square meters, C. cubic meters, D. seat 5., the top of the balcony with anti eaves, plastering works should be horizontal projection area multiplied by (B) coefficient. A.1.5 B.1.3 C.1.2 D.1.1 6. the length of the excavation of the inner wall foundation is taken from the adjacent foundation (C) distance. A. center line B. wall inside, C. bottom side inside, D. upper steps inside 7. artificially excavated two types of soil quota, the slope coefficient is (C). A. 1.2, B. 1.35, C. 0.42, D. 0.29 8., civil engineering contractor material construction, the current Heilongjiang quota (C) as the base fee. A. direct fee, B. engineering fee, C. labor cost, D. material fee 9., the amount of brick wall calculation should be increased (A). A. three bricks above the waist line C. B. top three bricks under the eaves D. window stellers brick 10., the three refers to the basic construction (A). A. budget estimate, budget and final accounts, B. budget estimate, budget and settlement C. construction drawing budget, construction budget, settlement of D. design budget, construction drawing budget, construction budget 11. the tax included in the calculation of the cost of the project includes (C). A. component value-added tax, B. stamp duty, C. sales tax, D. loan interest 12. the preparation of construction drawing budget is (B). A. individual projec
您可能关注的文档
- 手动卸载OFFICE2010(Manually uninstall OFFICE2010).doc
- 手动卸载赛门铁克企业版SEP11的方法(Method for manually uninstalling Symantec enterprise version SEP11).doc
- 手动修复Win7XP双系统引导多种方法(Manual repair of Win7XP dual system boot multiple methods).doc
- 手动修改网卡的MAC地址(Manually modify the MAC address of the network card).doc
- 手动优化C盘空间(Manual optimization of disk space).doc
- 手动注入(Manual injection).doc
- 手动装GHOST11(Hand installed GHOST11).doc
- 手工电子焊接和工具的资料(Manual electronic soldering and tool data).doc
- 手动清理优化系统盘(Manually clean and optimize the system disk).doc
- 手机白光LED驱动电路解决方案分析(Analysis of mobile white LED drive circuit solution).doc
- 预算调整与滚动预算-课堂问题答疑-精华必看(Budget adjustment and rolling budget - classroom questions - the essence must see).doc
- 阅读改变人生12(Reading changes life 12).doc
- 阅读理解5(Reading comprehension 5).doc
- 越南河内国际工具机暨自动化设备展(Hanoi International Machine Tool & Automation Equipment Exhibition).doc
- 运动会计分系统流程(Sports accounting subsystem flow).doc
- 载波电能表(Carrier energy meter).doc
- 长白山旅游攻略(Changbai Mountain Travel Guide).doc
- 长城作文(The Great Wall composition).doc
- 长江口以东海域6.1级地震地下水前兆异常(Precursory anomalies of groundwater in the 6.1 earthquake in the east of the Yangtze Estuary).doc
- 长江三角洲_百度百科(The Yangtze River Delta _ Baidu Encyclopedia).doc
文档评论(0)