建筑资料(Building materials).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑资料(Building materials)

建筑资料(Building materials) Road network planning and route survey design Road network planning should consider the coordinated development of various transportation functions, and improve the layout of the road network. Route survey and design should be based on the national classification management and technical indicators, road engineering The selected technical and economic route optimization, comprehensive design of vertical and horizontal three aspects, and strive to short the plane smooth, uniform cross section, vertical gentle slope stability of the economy, in order to ensure that the design speed and shorten the running time, improve vehicle turnover rate. The design of subgrade, pavement, bridge, tunnel, drainage and other structures are carefully designed. Under the condition of guaranteeing quality, construction, maintenance, operation and traffic management are reduced. Subgrade engineering The subgrade is the main part of the road and the foundation of the road and bears the load of the road with the road surface. The subgrade is divided into three types: embankment type, cut type and semi fill type. The shoulder is the inner part of the subgrade edge on both sides of the road to support the road surface and is used for the temporary stopping of vehicles or pedestrians. According to the roadbed earthwork excavation difficult for earthwork (soil, soil, hard soil and rock engineering (three), soft stone stone, stone three). Roadbed engineering in road construction, large quantity, wide area, often is the key to the control of the construction schedule is required as much as possible and water conservancy construction along the combination and strive to save land; second, in accordance with the standard design, strictly control the construction quality, ensure the subgrade with sufficient strength and stability; the good drainage and protection of the subgrade reinforcement project, attention should not be destroyed by the flood; the embankment should be c

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档