- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
块石片石区别(Stone rubble difference)
块石片石区别(Stone rubble difference)
Stone, by blasting or wedge mining thickness not less than 15cm
Stone, by the rock or chop into chunks of rock, shape of the founder, roughly flat, thickness not less than 20cm, the width is about the thickness of 1 to 1.5 times, the length is about the thickness of 1.5 ~ 3 times.
Stone, and the stone asked almost, but the thickness is 7~25cm, and each side bump height of not more than 10mm
1. phenomena
The retaining wall does not leave the drain L, or the discharge hole is blocked or the wall is discharged. The fL drain is made of hydrophobic layer or drainage slope
Enough, earth in serious water retaining and water retaining wall at the same time, the internal force increased significantly, causing wall tilt
Deformation, cracking, or even collapse.
2. cause analysis
(1) the drainage hole is not kept according to the drawing requirements, or the method of retaining hole is wrong and causes blockage.
(2) the hydrophobic layer has not been laid out according to the construction specifications or drawings.
(3) the inner wall does not make the flashing slope in accordance with the regulations, construction materials and soil residues at the foot of the wall is not cleared.
3. preventive measures
(1) masonry retaining walls shall be provided with drain holes according to the design requirements. The drainage hole should adopt the method of retaining sleeves and check.
Whether the water outlet is unblocked or not, and if it is blocked, it should be cleared or repaired in time.
(2) in the backfill after the wall, the drain hole and the surrounding area shall be used as the drain layer
On the horizontal surface of the drain hole, loosen 30cm, thick 20cm crushed stone or cobble to make the sparse water layer, in order to make the water inside the soil drain along the drain hole.
(3) the top surface of retaining walls should have an appropriate slope so that the surface water flows to the outer side of the retaining wall.
4. governance methods
您可能关注的文档
- 各报纸投稿(Contributions from newspapers).doc
- 各种促销方式下的零售销项税基(A variety of promotions under the retail sales tax base).doc
- 各种原则(喜悦心)(Various principles (joy)).doc
- 各种本质、核心、方针、路线、指导思想总结(A summary of various essences, cores, policies, lines and guiding ideology).doc
- 各种水晶和石头的功效(The effect of various crystals and stones).doc
- 各种饮料批发价(Wholesale price of various drinks).doc
- 各类体检套餐(All kinds of medical packages).doc
- 各地古玩(Antiques by nationality).doc
- 各类电梯故障与修复(Various types of elevator failures and repair).doc
- 各地时间,汇率,节日,港口(Time, exchange rate, festival, port).doc
- 2025贵州遵义市湄潭县农业农村局招募特聘农技员5人笔试备考题库及答案解析.docx
- 2025宝鸡凤翔圣元康复医院招聘(50人)笔试备考试题及答案解析.docx
- 2025福建新华发行(集团)有限责任公司招聘若干人笔试备考题库及答案解析.docx
- 2025广东江门市统计局及下属单位选调公务员2人笔试备考题库及答案解析.docx
- 2025广西南宁市江南区富宁小学招聘笔试备考题库及答案解析.docx
- 2025广东江门市五邑中医院(暨南大学附属江门中医院)第三批招聘14人笔试备考试题及答案解析.docx
- 2025黑龙江齐齐哈尔市讷河市发展和改革局择优选调9人笔试备考试题及答案解析.docx
- 2025贵州遵义桐梓县考调事业单位工作人员15人笔试备考试题及答案解析.docx
- 2025呼和浩特市文化旅游投资集团第一批招聘42名工作人员笔试备考试题及答案解析.docx
- 2025福建漳州龙海区乌礁中学临聘代课教师1人笔试备考试题及答案解析.docx
最近下载
- 基坑监测记录表完整.doc VIP
- 2025年湖北高考历史真题试卷及答案.docx VIP
- 骨科手术患者心理护理.pptx
- 2025年湖北高考英语真题试卷及答案.docx VIP
- 2025湖北高考地理真题试卷+解析及答案.docx VIP
- 研究生学生突发事件处理办法.doc
- 2025甘肃定西市招聘专业化管理村党组织书记103人考试备考试题及答案解析.docx VIP
- 一种小鼠结直肠原位癌模型的构建方法.pdf VIP
- 百度地图-北京市购物中心报告-71页.pdf VIP
- 克莱斯勒-Grand Voyager-产品使用说明书-Grand Voyager(3.6L)-Grand Voyager(3.6L)-2013款大捷龙用户手册(产品使用说明书).pdf
文档评论(0)