- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
定额中涉及系数换算的项目(A project involving the conversion of coefficients in a quota)
定额中涉及系数换算的项目(A project involving the conversion of coefficients in a quota)
Quota specification
1, artificial excavation, digging trenches, pit depth of the project is 6m, more than 6m, according to 6m 1m within each deepening by a factor of 1.25.
2. Man-made earthwork is made up of dry soil, such as digging wet soil, multiplied by factor 1.18.
3. When digging earth under the support of the retaining plate, multiply the coefficient by 1.43 according to the actual excavation volume.
4, when digging between piles, according to the actual excavation volume (minus the volume of the pile), multiplied by factor 1.5
5, the foundation backfill lime soil, apply B.1 building ground engineering corresponding items, multiplied by factor 0.7.
6, mechanical excavation depth is 5m, more than 5m, fixed manual and mechanical multiplied by factor 1.11.
7, the mechanical excavation between the soil, according to the actual excavation volume (minus the volume of pile), the corresponding items multiplied by factor 1.15.
8, mechanical movement of silt, sand flow by mechanical earthwork, the corresponding items multiplied by factor 1.50.
9, soil moisture content is prepared by natural water content, if soil moisture content is greater than 25%, the project artificial and mechanical multiplied by factor 1.15; if the soil moisture content reached saturation, calculated separately.
10, bulldozer scraper shovel or the average thickness of soil layer is less than 300mm, the amount of rent multiplied by the coefficient 1.25 bulldozer scraper shift amount multiplied by the coefficient 1.17.
11, excavator operating in the pad, artificial and mechanical by a factor of 1.25, the project is not included in the required quantity, laying plate mechanical consumption occurs when the other column project calculation.
12, bulldozer, scraper, push and shovel without compacted accumulation soil, according to the corresponding items multiplied by factor 0.73.
13, test pile (including anchor pile) according
您可能关注的文档
- 如何把WORD文档转成JPG格式的.(How do I translate WORD documents into JPG format).doc
- 如何打造高效益团队(How to build a high benefit team).doc
- 如何开发右脑使记忆增强(How do you develop the right brain to increase memory).doc
- 如何抢进连续涨停板(How to grab into the continuous trading board).doc
- 如何才能执行好绩效考核管理方案(How can we carry out a good performance appraisal management program).doc
- 如何拍出清晰的照片(How do I take a clear picture).doc
- 如何掌握说话技巧(How to master the speaking skills).doc
- 如何推广自己的店铺(How to promote your store).doc
- 如何提升哲学素养(How to improve philosophy quality).doc
- 如何描述自己的能力(How to describe your abilities).doc
- 宝宝哭闹语言(Baby crying language).doc
- 宝宝名字(Baby name).doc
- 宝宝坐飞机的注意事项(Baby aircraft attention).doc
- 宝宝四周岁(Baby four years old).doc
- 宝宝夜间啼哭不止中医教你治(The baby cries at night and he teaches you how to treat it).doc
- 宝宝多大可以用枕头(How old is your baby You can use a pillow).doc
- 宗庆后点评娃哈哈四步棋市场换技术是失败的(Zong Qinghou commented Wahaha four moves the market for technology is a failure).doc
- 宝宝大小便习惯的培养(Baby habit training).doc
- 宝宝小名大全(Baby name Daquan).doc
- 宝宝常用药(Baby medicine).doc
文档评论(0)