北京SOHO临电施工组织设计(Construction organization design of Beijing SOHO temporary electricity).docVIP
- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
北京SOHO临电施工组织设计(Construction organization design of Beijing SOHO temporary electricity)
北京SOHO临电施工组织设计(Construction organization design of Beijing SOHO temporary electricity)
Volume first project overview 2
Second volume temporary power consumption overall arrangement 2
Third volume field site 2
The first chapter is the laying of cable 2
The second chapter electric box setting 3
Third chapter electric box protection shed manufacture 3
The fourth chapter electric box installation measures 3
The fifth chapter: setting up standard of protective box for electric box 3
The sixth chapter draws 7 circuits from the distribution room, 4
Table fourth power requirements of equipment for field construction 4
Fifth volumes of field power equipment (power calculation) 7
The first chapter is the total power consumption of the construction site 7
The second chapter loop power traverse calculation 8
Sixth volume construction technology, safety fire prevention measures 13
The first chapter construction technical requirements 13
The second chapter safety fire prevention measures 15
The third chapter safety measures 15
Seventh rolls of on-site electrician responsibility system 16
First volume project overview
Beijing SOHO modern city is located in Changan Avenue, the entrance to Tokyo expressway. It has a construction area of 220 thousand square meters, and the highest level is 128 meters. It is a landmark building of the modern city park.
According to the construction site temporary electrical safety requirements of technical specification of JGJ46-88, the temporary use of electricity equipment in 5 units and 5 units or above the total capacity of the plant at 50KW and 50KW above must prepare a temporary power construction organization design, to ensure that Beijing SOHO modern city engineering construction preparation of this special construction organization design.
Second volume temporary power consumption overall arrangement
The owners to provide a 1250KVA power transformer, according to the construction characteristics and construction site plane, to temporary power
您可能关注的文档
- 农业生态园策划方案(Planning plan of agricultural ecological garden).doc
- 农业起源问题整理思考(Origin of agriculture, problem, arrangement, thought).doc
- 农产品套期保值介绍(Introduction to hedging of agricultural products).doc
- 农作物主要虫害识别及防治(Identification and control of major insect pests in crops).doc
- 农作物产量与气候变化之间的关系(The relationship between crop yield and climate change).doc
- 农信社介绍(Introduction of rural credit cooperatives).doc
- 农历节日(the Spring Festival).doc
- 农发行新农村建设贷款试行办法(Tentative Measures for new rural construction loans issued by agricultural enterprises).doc
- 农大园林植物(Nongda garden plant).doc
- 农村中学青少年思想道德建设中存在的问题及解决对策(Problems and solutions in the ideological and moral construction of teenagers in rural middle schools).doc
- 建设工程质量安全管理标准化图集(安全篇2024版)ppt230页.pptx
- 《油气储存企业安全风险评估细则(2025年修订)》解读.pptx
- 2025年《危大工程专项施工方案严重缺陷清单专题培训》ppt120页_1230.pptx
- 中建分部分项检验批划分方案、资料目录策划编制要点ppt75页.pptx
- 某项目智慧工地示范项目应用成果介绍75页_5843.pptx
- 2025年中国风筝无人机LED夜光编队编程师应聘面试模拟题及答案.doc
- 2025年中国鞍钢集团招聘笔试题库附答案.doc
- 2025年中国鞍钢集团招聘面试预测题及答案.doc
- 临床器械实验培训试题及答案2025年版.docx
- 中石化《两个责任》解读分析.ppt
文档评论(0)