电力安全规程线路部分---------临近带电导线的工作(The working part - near the electric wire line power safety procedures).docVIP

电力安全规程线路部分---------临近带电导线的工作(The working part - near the electric wire line power safety procedures).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电力安全规程线路部分---------临近带电导线的工作(The working part - near the electric wire line power safety procedures)

电力安全规程线路部分---------临近带电导线的工作(The working part - near the electric wire line power safety procedures) 5 approaching the work of live wires 5.1 work on live line towers 5.1.1 in the tower charged measurement, corrosion, inspection, tight bolts, clear the tower tower body work, workers and carry the range of materials and tools, and the minimum distance of electric wire shall not be less than the provisions of 5-1 table. slightly 5.1.2 works on 10KV and below live electric towers, and the vertical distance of the work line from the lowest layer live conductor shall not be less than 0.7m. 5.2 work near or crossing other power lines 5.2.1 outage maintenance lines such as with another live line or cross close contact or close to the table within the distance that the 5-2 security work personnel and equipment may be another wire, the other lines should be grounded to the power and. If the line near or crossing cannot be cut off, the provisions of 5.2.2-5.2.4 shall be observed. Measures to prevent damage to another line shall be taken in the work. slightly 5.2.2 when approaching a live electric circuit, it is possible to approach the live wire to the safety distance shown in table 5-2, and the following requirements shall be met; 1) take effective measures to make the human body, wire, construction machinery, traction rope and pulling rope comply with the safe distance of table 5-2; 2) the guide wire and ground wire of the work should also be grounded at the working place. Traction winch and tools should be grounded. 5.2.3 in the cross block tightness, reduce or erection of wire work, only the maintenance outage can be charged in line line below, should be taken to prevent wire bouncing or traction and electric wire close to the table within the 5-2 safe distance measures. The line for power failure inspection, such as on the other side of the circuit, should be taken as a reliable measure to relax or erect the conductor and ground wire and to replace the insulators under t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档