- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
消防组织施工方案(Fire organization construction scheme)
消防组织施工方案(Fire organization construction scheme)
After the fire detector moves, the shutter falls to the end.
Engineering organization design and management
An overview of the installation and construction, fire protection systems and equipment do not require large-scale equipment, the biggest characteristic is with civil engineering, hydropower, decoration, air conditioning and other professionals have more or less, there are a lot of cross operation and coordination, so the construction organization and quality assurance is very important. The key to the construction is: 1, personnel quality; 2, construction organization and management; 3, cooperation spirit (especially with other professional contractors of different coordination). Conscientiously implement the above three aspects of the problem, in order to achieve: 1, to ensure the quality of the project; 2, the completion of the project on schedule; 3, improve work efficiency. Two, general situation of the engineering project name: new moon Ming Hua Garden 13 building fire installation project location: Panyu District Stone Town Construction: the revitalization of Guangdong Fire Engineering Co. Ltd. plan period: 2005 01 month 10 days to start construction, according to the construction schedule. 2 、 Engineering Introduction: this building is a ground floor, 21 floors on the ground. The relevant rules and regulations on Party A drawings design unit 3, prepared based on the tender and answering documents of national and local governments on the overall progress of the project for fire and electrical and mechanical equipment installation engineering company for many years, the experience of other relevant factors, three construction schemes
1 、 construction process:
Professional coordination, professional coordination, confirmation of organization, construction drawing design, formulation of engineering tasks, book examination, material procurement, professional coordination, pipe installation, intermediate accept
您可能关注的文档
- 日企工作常用语 中日对照 超实用(Japanese enterprises are commonly used in language, Chinese and Japanese comparison, super practical).doc
- 无领导面经(Without leadership).doc
- 日事日毕、日清日高——海尔的oec管理模式(Completion date issue date, Nissin high - Haier OEC management model).doc
- 日元升值永远的痛(The appreciation of the yen hurts forever).doc
- 日哦(Oh).doc
- 日本也有黄金周(Japan also has golden week).doc
- 日本、东京交通(Transportation in Japan and Tokyo).doc
- 日本产业结构(Japanese industrial structure).doc
- 日本品牌在中国是如何坠落的(How did Japanese brands fall in China).doc
- 日本官二代为何没有财产(Why does Japan's official two generations have no property).doc
- 消防安全责任书(消防管理范围)(Fire safety responsibility book (fire management scope)).doc
- 消防设备管理制度(Fire equipment management system).doc
- 消防逃生程序(Fire escape procedure).doc
- 消防防火监督先进事迹(Advanced deeds of fire control and fire prevention supervision).doc
- 消防验收(Fire inspection and acceptance).doc
- 液压专业英语词汇(Hydraulic English Vocabulary).doc
- 液压2(Hydraulic 2).doc
- 消防预案(Fire fighting plan).doc
- 液压件将迎来发展新机遇(Hydraulic parts will usher in new opportunities for development).doc
- 液压优缺点(Hydraulic advantages and disadvantages).doc
文档评论(0)