- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安装期末a卷(Install the final a volume)
安装期末a卷(Install the final a volume)
Class name, student number
2009/2010 academic year second semester end
Installation project budget and final examination questions A volume
(closed volume) available calculator
(08 (three special) project cost 1 or 2)
Note: Please fill in the following answer sheet and fill in the blank.
I. individual choice questions: (2 points per subject, total 20 points)
1, the non valuation material is also called (C). The answer is textbook P11
A. auxiliary material B. sporadic material
C. main material D. turnover material
2, in listing setting, 02 of the item code 030212001001 represents (B). See the example solution P111
A. lamp installation engineering, B. electrical equipment installation engineering
C. decoration project D. plumbing pipe installation works
3, the following does not belong to the fee is (D). The answer is textbook P40
A. pollution discharge fee B. quota determination fee
C. dangerous operations, accident insurance, D., urban maintenance and construction tax
4, the tender control price is the bidding project (A) project cost. See example solution P16
A. limits the maximum B. limit to the minimum
C. qualified bid D. limited bid
5, the sub item volume list should be used (B) valuation. See example solution P13
A. management plus profit B. comprehensive unit price
C. autonomous bidding, D., base addition factor
6, according to the national tax law should be included in the cost of construction and installation costs, known as (C tax), see the textbook P42
A. fee B. comprehensive fee
C. tax D. management
7, in the 08 list specification, C.2 electrical equipment installation works applies to (B) installation works. See textbook P93
A.10KV overhead power distribution equipment and transmission line distribution equipment and circuit below B.10KV
C.10KV control equipment and low voltage electrical equipment, less than D.10KV electrical equipment
8, 08 list valuation standard stipulated in, the water supply pipeline engineering q
您可能关注的文档
- 声乐练习(Vocal exercises).doc
- 声波原理与窃听技术(Principles of sound waves and eavesdropping techniques).doc
- 复习参考题(Review reference questions).doc
- 复习经验(Review experience).doc
- 复印机常见故障(Copier common faults).doc
- 复试如何直面导师(How to tutor face to face).doc
- 复垦流程(Reclamation process).doc
- 复旦大学水平测试试题(Fudan University proficiency test).doc
- 复试行程指南(Re examination tour guide).doc
- 复印机的保养使用常识(Maintenance and use of copiers).doc
- 2025年事业单位招聘考试计算机专业能力测试试卷实战演练与技巧.docx
- 2025年企业培训师(高级)考试试卷:企业培训师创新思维训练.docx
- 2025年事业单位招聘考试计算机专业能力测试试卷实战演练.docx
- 2025年事业单位招聘考试计算机专业能力测试试卷实战训练与答案.docx
- 2025年事业单位招聘考试计算机类专业能力测试试卷(云计算方向).docx
- 2025年事业单位招聘考试计算机专业能力测试试卷重点题型分析.docx
- 2025年事业单位招聘考试计算机专业能力测试试卷深度解析及预测.docx
- 2025年山西省事业单位招聘考试卫生类中医学专业知识试卷.docx
- 2025年事业单位综合类专业能力测试试卷(工程类)-通信工程原理试题.docx
- 2025年山西省三支一扶考试公共基础知识试卷答案.docx
文档评论(0)