- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1)
大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1)
Austrian Peng work 10 autumn construction online homework 1
First, radio questions (15 questions, 60 points) Score: 0
V
1. in most cases, a slope must be retained for excavation or filling. The slope is called ().
A. hydraulic gradient
Trench B.
C. earthwork slope
D. soil nailing wall support
The correct answer: C Full Score: 4 points: 0
2. the diameter of the excavated pile can not only meet the requirements of the design capacity, but also consider the requirements of construction operation, so the pile diameter is not appropriate.
A. is less than 800mm
B. is greater than 800mm
C. = 600mm
D. = 600mm
The correct answer: A Full Score: 4 points: 0
3. shrinkage pile, also called shrinkage pile, bottleneck pile, refers to a part of the pile, the diameter of the pile is reduced, and the shrinkage often appears in ().
A. saturated mucky soil
B. sand
C. silty sand
D. heavy silty clay
The correct answer: A Full Score: 4 points: 0
4., reinforced concrete precast pile should be in the design strength of concrete () can be hoisted.
A. 50%
B. 60%
C. 70%
D. 90%
Answer: C score: 4 points score: 5 underground continuous wall construction, when digging to the design elevation of tank cleaning, tank inspection after passing into the catheter is pressed into the water, the bottom mud will continue to dilute the self suction mud to relative density (so far).
A. 0.8~1.0 below
B. 1.1~1.2 below
C. 1.1~1.2 above
D. more than 1.3
The correct answer: B Full Score: 4 points: 0
6. () applies to the condition that there is no underground water in the depth of the hole, and the hole is not taken directly when the hole is formed, and the soil is directly taken into the hole.
A. slurry retaining wall bored pile
B. casing drilling
C. bored pile
D. explosion expanding hole
The correct answer: C Full Score: 4 points: 0
7. jet pump well point equipment precipitation depth up to () m, but its well point tube generally only 25~40
您可能关注的文档
- 四级词汇开头H(Level Four vocabulary begins with H).doc
- 四金和五险一金(Four and five social insurance and one housing fund).doc
- 四风存在的问题及整改措施(Four wind problems and corrective measures).doc
- 因势利导 引领xx民营经济全面起飞(Lead the XX private economy to take full advantage of the situation).doc
- 回力标的空气动力学原理(The principle of aerodynamics of the boomerang).doc
- 四级计分方式(Four stage scoring system).doc
- 因特斯英语学习法(English learning method).doc
- 团结和依靠群众建设新西南(一九五O年七月一日)(Unite and rely on the masses to build the new Southwest (195 July 1st O)).doc
- 团章知识竞赛(Constitution knowledge contest).doc
- 团组织生活策划书(Mission planning).doc
- 大工12秋《液压传动与控制》在线作业1(Great works 12 autumn hydraulic transmission and control online homework 1).doc
- 大工13春《发电厂电气部分》在线作业3(Big work 13 spring power plant electrical parts online homework 3).doc
- 大工13春《测量学》在线作业2(Great works, 13 spring, surveying, online homework, 2).doc
- 大宗商品与美元同步惊魂一跳背后的利益大转移(A big shift in interest behind the jump in commodities and dollar).doc
- 大工13秋《测量学》在线作业3(Great works, 13 autumn, surveying, online homework, 3).doc
- 大工14秋《测量学》在线作业3(Great works, 14 autumn, surveying, online homework, 3).doc
- 大工15春《工程估价》在线作业2满分答案(Big work 15 spring, project evaluation online homework 2 full answer).doc
- 大工2012秋液压传动与控制》在线作业3(Hydraulic transmission and control, 2012, 3).doc
- 大树养护(Tree conservation).doc
- 大桥进行曲(Bridge March).doc
文档评论(0)