- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工技术-散水施工工艺(Construction technology - water - dispersed construction technology)
施工技术-散水施工工艺(Construction technology - water - dispersed construction technology) Process of bulk water construction A,? Construction preparation (I) working conditions 1,? ????? The wall decoration has been basically completed, the outer scaffolding has been removed, the water base elevation, the dimension has been inspected, and has been completed, the procedure of the advance inspection. 2.? ????? The scattered water should be divided into pieces, and the length of the block should not be bigger than 6m. The remaining seam should consider the overall effect of the building. 3,? ????? Peg the horizontal piles according to the elevation line. 4,? ????? Check the mix ratio of the concrete, check the backstage scale, and carry out the opening at the end of the opening. The strength of the concrete is not less than C15. 5,? ????? The size of bulk water should be according to the design drawing, the width of the general gray soil cushion shall not be less than 800mm, the thickness of the thickness shall not be less than 150mm, and the width of concrete shall not be less than 600mm. The thickness is not less than 50mm. (2) material requirements 1,? ?? ? Soil: appropriate use priority base slot to dig in the soil, or similar soil clay, loam, must not contain any organic impurities, before using appropriate sieving, its size is not more than 15 mm, water content is 12% ~ 15% (feel can knead dough, light break away). 2.? ????? Lime: the application of ash or lime powder can be thoroughly cooked before use. It should not contain unripe lime blocks, and its particle size is not greater than 5mm, and it should not contain excessive moisture. 3,? ????? Cement, appropriate is used more than 32.5 on the Richter scale and its silicate slag Portland cement, Portland, or, appropriate chooses the same cement production factory with varieties at the same time, with the concrete strength grade, the same factory number. 4,? ????? Sand: medium sand or coarse sand, less than 3 %. 5,? ???
您可能关注的文档
- 建模论文(Modeling paper).doc
- 建立我国地方公债制度的探讨(To establish the discussion of local public debt system in China).doc
- 建筑tip100条(Building tip100 article).doc
- 建立电子政务空间辅助决策应用系统应主义的几个问题(Some problems of the application system of e-government space auxiliary decision-making system should be established).doc
- 建筑 名言录(Architectural quotations).doc
- 建筑专业图集大全2011(Architectural professional atlas 2011).doc
- 建筑专业--学生Tips100条(Architecture major - student Tips100).doc
- 建筑专业英语单词200个(There are 200 English words for architecture).doc
- 建筑史年谱(Architectural history).doc
- 建筑同城市的关系(The relationship between the building and the city).doc
- 施工现场临时供用电施工组织设计(Construction site temporary power supply construction organization design).doc
- 施工现场漏电保护器误动作原因及预防措施探讨(The cause of misoperation of leakage protection and the prevention measures are discussed).doc
- 施耐德产品一览表(A list of schneider products).doc
- 施工组织毕业设计(Construction organization graduation design).doc
- 旅游规划应着力的八个要点(Eight key points for tourism planning).doc
- 旅行须知(Travel information).doc
- 旅馆名词(The hotel noun).doc
- 旋挖钻机在泥岩地层施工的工法规律(The law of construction of a rotary drill rig in mudstone formation).doc
- 旋转机械故障诊断(Rotary mechanical fault diagnosis).doc
- 无人岛物语4修改(No one island object 4 modifies).doc
文档评论(0)