搅拌桩、静压桩(Mixing pile and static pile).docVIP

搅拌桩、静压桩(Mixing pile and static pile).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
搅拌桩、静压桩(Mixing pile and static pile)

搅拌桩、静压桩(Mixing pile and static pile) Measures for quality control of cement mixing pile construction As is known to all, during the construction of soft clay foundation, the cement mixing pile construction is one of the common processing method, its main features are: a reasonable time limit, low pressure during the construction of the operation, safe and reliable, less pollution, no vibration, no noise, and buildings with no adverse effects on the surrounding environment. How to increase the bearing capacity of soft soil foundation and reduce the compressive quantity of soft soil foundation, the key is to control the construction quality of cement mixing pile. 1. Quality control of preparation before construction 1.1 construction preparation and site formation 1.1.1 the access road of construction machinery should be repaired; 1.1.2 the power supply facilities shall be complete. In the construction site without external power supply, diesel generator shall be equipped; 1.1.3 identify obstacles within the construction scope. There are large stones and underground pipelines underground, etc. All obstacles should be cleared or established in advance to avoid and ensure safe production; 1.1.4 level is flat. In the area where the construction of the pile is prepared, the surface of the ground is roughing with a bulldozer, then the coarse sand cushion layer in the backfill, then the levelling machine. Where conditions are available, the roller can be used for 1 ~ 2 times. 1.2 construction lofting First using total station (or transit) accurately release starting pile construction paragraph and line position, and design requirements of steel pile spacing with sticks to identify the pile location within the scope of construction (general according to the regular triangle arrangement). 1.3 quality control of raw materials 1.3.1 the quality of cement (curing agent) is the key, and the cement variety and quality shall meet the requirements of design and specification. Before

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档