小直径锚索在高地应力大变形隧道施工中应用(The small diameter anchor cable is applied in the construction of high ground stress deformation tunnel).docVIP

小直径锚索在高地应力大变形隧道施工中应用(The small diameter anchor cable is applied in the construction of high ground stress deformation tunnel).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
小直径锚索在高地应力大变形隧道施工中应用(The small diameter anchor cable is applied in the construction of high ground stress deformation tunnel)

小直径锚索在高地应力大变形隧道施工中应用(The small diameter anchor cable is applied in the construction of high ground stress deformation tunnel) Statistical analysis of the mechanical management of the slope of the tunnel no.9 Giant scene only (wui coleopling, LTD.) 1. Project overview China is currently building the longest wu-coleopling tunnel (20050 meters) in the country, which is located between the redevelopment of the railway lanzhou railway line and the longditch station. Designed to be two single-wire tunnels with a line spacing of 40m. The maximum depth of the hole is 1,100 meters, and the design takes long tunneling measures, with 13 incline shafts and 14 auxiliary shafts in one shaft, of which 9 # slope is one of them. The slope of the wu-coleopling tunnel is located in the ridge section of the ridge, with a total length of 2429 meters and an average slope of 11.76%, with a maximum slope of 12.61%. Set eight lanes and five tunings. Inclined hole wall rock breakage and Ⅴ class accounts for over 50% of surrounding rock, the excavation area of 39 m2. The main area of the cave is a thousand rocks, and the area of the excavation area is 71.57-74.6 m2. As of June 30, 2005, the right line of zhengdong was completed by 1511 meters and the left line was completed 600 meters. The hole is accumulated into a hole of 1,660 meters. 2. Slope equipment configuration An average of 200 meters per month and 250 meters per month. The following table is configured in the slope equipment: The serial number Equipment category Device name specifications The Numbers one Earthwork machinery excavator DH220 1 m3 90 kw one 2 Earthwork machinery loader 2.7 m3 ZLC50C 154.5 KW 2 3 Earthwork machinery Tunnel loader ITC312H4 63 kw one 4 Earthwork machinery Axial flow fan MFA125P - SCHS 220 kw 2 5 Earthwork machinery Axial flow fan MFA100P - SCHS 110 kw one 6 Power machinery Electric air compressor P900E 25 m3 / min to 160 kw 3 7 Power machinery Electric air compressor P950E 25 m3 / min to 160 kw 2 8 Power

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档