园林硬景施工组织样本(Sample of garden hard view construction organization).docVIP

园林硬景施工组织样本(Sample of garden hard view construction organization).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
园林硬景施工组织样本(Sample of garden hard view construction organization)

园林硬景施工组织样本(Sample of garden hard view construction organization) Design of garden hard landscape design - sample Construction organization design (hard view part) I. project overview: 1, * * * * * * * * * new campus landscape engineering in * * * * * * * * economic and technological development zone north of south of the city road, west of koto road block, a total land area of 311000 square meters, including rigid pavement is about 22000 square meters, the water landscape area of about 02700 square meters, greening landscape area of about 281300 square meters. 2 square, landscape from the central square, entrance plaza and the school before the square of three big square, such as main attractions are: purple front garden, fishermans wharf, bridge, wharf landscape platform between teachers and students, main axis scenic area, living area pavement, annular sidewalk, development steps for dean, living quarters, dean, but parking lot color brick and the brick that set straw pavement, etc. When completed, it will be a natural ecological landscape integrating leisure, learning and entertainment. 3. The project is invested by * * * * * * * * * * * * *, and the project is planned for: 60 days. 4. Engineering features: this project covers an area of large area, with many scenic spots and delicate features. The local process requires complicated construction, and the construction period is shorter. Ii. Construction layout: According to the information and the construction site condition of the project, the construction of this project is set up according to the previous construction experience and working ability of the company. 1. Layout principle: To strengthen the construction in the process of dynamic management, reasonable arrangement of construction machinery, equipment and labor input, on the premise of to ensure the quality of every working procedure, based on the working speed and scientific organization and cross water homework, labor discipline strictly, serious co

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档