- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一、上周工程总结(I. project summary last week)
一、上周工程总结(I. project summary last week) I. project summary last week: Last week project image progress: (1) finish coating of the inner wall of the experimental building; A coat of ground; Roofing waterproof insulation layer; The outdoor soil will be completed and the weekly plan will be completed. (2) the framework of the middle water pretreatment chamber is 6.7 meters beam, plate and column. The frame construction period was not completed as planned due to the previous plan adjustment. (3) the boiler replenishment water treatment outdoor wall is finished; The installation of indoor drainage ditch and ground floor has not been completed according to plan. (4) machine power tower 5.9 m beam column is poured, according to weekly plan completion. (5) the comprehensive water pump room equipment foundation rebar production; The industrial pool wall rebar is completed by the weekly plan. (6) the wall of ash storage 2.15m and the beams, plates and columns are cast, because of the lag of the previous period, which is not completed according to plan. (7) 80% of the basic wall masonry of the ammonia area is completed by the weekly plan. (8) the superstructure of the upper structure of ammonia is completed by 30% and the weekly plan is completed. (9) after installation of water pipes in the experimental building area, the integrated water pipe of the factory was installed 80 meters and completed by the weekly schedule. (10) the cationic exchanger and anion exchanger in the boiler supply water treatment room are in place, and the mixed ion exchangers are not in place due to the failure of the resin storage tanks. (11) the installation of the bottom plate of the water tank was not completed due to the material failure. 2. Last week plan to complete the statistics Statistics on the completion of construction plan for the first week of April in the jiayuguan pass (2 * 350MW) of jiujiang jiujiang co., LTD. (2012.3.30-4.5) The serial number Project number Branch (sub-item) project n
您可能关注的文档
- json数据解析(Json data parsing).doc
- jiepo1().doc
- iptable命令(Iptables command).doc
- JV-33用户操作手册(Jv-33 user operation manual).doc
- JVM进程(JVM process).doc
- Kindle3使用手册(Kindle3 use manual).doc
- kms11塑料成型iem(Kms11 plastic forming iem).doc
- koudaijinhgling(koudaijinhgling).doc
- kyn28-24(kyn28 -24).doc
- LABSKY检验天空继续教育在线考试(LABSKY tests the sky to continue the education online exam).doc
- 【贵州诗人经典作品选】贵州诗词2007年7期选登([guizhou poets' classic works] guizhou poetry, 2007).doc
- 一、检测技术基础知识(I. basic knowledge of testing technology).doc
- 一、矿井通风设计的内容与要求(I. contents and requirements of mine ventilation design).doc
- 一个40年经验的驾驶员教练的心得开车篇(A 40-year experience as a driver coach).doc
- 一个ORACLE导入和导出XML文件的例子(An example of an ORACLE import and export of XML files).doc
- 一个供自动绘图机产生多种典型曲线的方法_王厚生(A method for generating a variety of typical curves for automatic plotter _ wang housheng).doc
- 一个好的管理者应必具备的条件(A good manager should have the conditions).doc
- 一个晚清官员的大清亡国反思(A late qing dynasty official's great qing dynasty reflected).doc
- 一个查询化学品性质的好网站,还可以查询价格(A good website for the nature of a query can also check prices).doc
- 一个问题(A problem).doc
文档评论(0)