- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
英文8D报告
Revision HistoryD0. Problem SummaryDate of Complaint:Date samples received at factory:NAType of Complaint:Customer Reference #:Supplier Reference #:Silicon Labs CAPA #:Silicon Labs RMA # / QI #:Customer Name:Supplier Name:Customer Part #:Silicon Labs Part #:Package:NABatch #(s):Tracecode(s):D1. Team FormationRoleNameTitleTeam Leader**CBU1 QESponsor**PMTeam Member*** Site QE*** PE engineer*** SMT supervisor***SMT PIE Leader***NPI engineer Management Stakeholder(s) ***Senior PM***QA manager***XF site operation manager***CBU1 GMPrepared by*** CBU1 QED2. Description of ProblemBackground InformationReceived quality feedback from the customer Secure Meter as below:1.15 failures of module ETRX-357-LRS in which IC is getting shifted in batch 160125This part is using in 3 different assemblies in Secure at 3 differentSMT lines and failure is reported in all three assembliesPhoto/Objective Evidence:Defect Id numberDate code133171601251329516012513434160125133281601251334816012513323160125D3. Interim Containment Actions* Start date:* Completion date: * Summary of results: Check and confirm risk batch on Ryder siteTo check the risk batch Qtyfor this quality issueResp: Yuan Fu PingDue: Status: Results: After checking the production record for X902D (ETRX-357-LRS), the risk batch ihe affected batch of modules is ETRX-357-LRS? QTY: 27000? Lot number: 78Reel label :004831-004875? PO:6000206962 To check the storage and WIP modules for on Ryder siteResp: Yuan Fu PingDue: Status: Results: * No stock found for DC 160125 in Ryder.* Total 45K of modules already shipped to customer Secure Meter. These 45K passed function inspectiontest* There are 34.8K of modules in Ryder FG store refer to following table shown * For this 34.8K of modules,Ryder will perform X-ray inspection especially on soldering pad of Skyworks IC to check whether?there are some?poor soldering issues ? * X- Ray process flow as following step Step 1 All modules would be remov
您可能关注的文档
最近下载
- 捕歼战斗中地排教案设计.doc VIP
- 深圳希莱恒电解质说明书.doc VIP
- 开展体育领域突出问题专项整治工作情况汇报.docx VIP
- 学校安全生产风险分级管控和隐患排查治理双重预防体系建设实施指南.pdf VIP
- 双眼视异常分析临床处理2020.pptx VIP
- 排捕歼战斗连贯演练.docx VIP
- Illustrator教程Illustrator绘图技巧Illustrator经典实例Illustrator网格工具绘制逼真花瓣.pdf VIP
- 民企混改公司合作协议书10篇.docx VIP
- 如何免费申请QQ号申请qq号方法.docx VIP
- Illustrator进阶技巧.pdf VIP
文档评论(0)