A350 Belly Fairing WORKPACKAGES STATUS
27 June 2017
Presented By :
Harbin MC,
Position: A350 Belly Fairing Project Manager
Name: Jiang Xuesong
INDEX
1. ToW status
2. Planning, ordering and delivery
3. Procurement
4. Outsourcing
5. Tooling
7. Composite – Quality, Manufacturing Engineering, Production
6. Assembly – Quality, Manufacturing Engineering, Production
8. Improvement action
Master Planning –PHASE I
27 June 2017
Page 3
QTY of panel of each AC was clarified in 2015. 2016. Details should refer to PO management list.
Drawing with modification is the critical milestone to achieve the plan.
Delivery plan Analysis:
Production Planning –PHASE II
27 June 2017
Page 4
HMC
FESHER
Delivery situation – PHASE I
27 June 2017
Page 5
PHASE I
MSN 32 (Comp)
MSN64 (Assy)
VBP01
VBP02
VBP03
VBP04
VBP05
VBP06
VB001
VB002
VB003
VB004
VB005
VB006
VB007
Seq. 01
Seq. 02
Seq. 03
Seq. 04
Seq. 05
Seq. 06
Seq. 07
Seq. 08
Seq. 09
Seq. 10
Seq. 11
Seq. 12
Seq. 13
Delivery Date
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
Total QTY of Panels
69
69
69
69
69
69
73
73
73
73
73
73
73
No technical issue
56
30
27
27
32
32
21
49
51
51
51
51
51
Thickness issue not in Stop Order
6
16
16
16
16
16
16
16
16
16
16
16
16
Panels due tooling Availability
2
2
2
2
2
2
6
6
6
6
6
6
6
Stop order
4
16
16
16
16
16
16
FPQ
1
5
8
8
0
0
2
2
MSN64
12
ALS requirement
56
46+6
43
43
67
67
56
65
51
51
51
51
51
HMC delivered
56
(40+3)
35
WIP
100%
WIP
100%
WIP
100%
WIP
Partial
WIP
Partial
* Detail P/N and QTY will be clarified in A350 BF PO MANAGERMENT-03.
**16 P/N with thickness issue (not in stop order) was stopped lay up from 10th AC.
Stop order should be discussed between both parties after the investigation W39.
Ordering – PHASE II
27 June 2017
Page 6
MSN 32 (Comp)
MSN64 (Assy)
PHASE II (HMC)
VBP01
VB001
VB002
Seq. 01
Seq. 02
Seq. 03
Total QTY of Panels
17
17
17
No technical issue
17
17
17
Thickness issue not in Stop Order
Panels due tooling Availability
S