- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高层住宅项目建筑工程施工组织设计方案(国外英文资料)
高层住宅项目建筑工程施工组织设计方案(国外英文资料) High-rise residential project construction project organization design The project management plan is applicable to the project under construction. 2, in the construction process using the new structure, new materials, new technology and application of a new type of construction machinery and the new test means, must pass the test and identification technology, and formulate feasible technological measures, the formation of technological standards for new supplementary provisions, trial supervision, examination and approval of Party newspaper. 3, pile foundation engineering, earthwork, deep excavation, large volume concrete, large span, conversion layer, prestressed engineering, large steel structure manufacture and installation, glass curtain wall, winter construction, scaffold engineering and high overhead erection, the special technical requirements of Engineering (insulation, thermal insulation, special concrete anti corrosion), special processes (underground waterproof, welding) construction and other special location, structure, process, must formulate specific technical measures, daily supervision, examination and approval of construction of Party A. 4, the construction process should strictly implement the rules and technical standards of the state and local industry promulgated and technology, and all kinds of building materials, semi-finished products and finished products quality standard, earnestly implement the relevant provisions of Party Construction management. 5, project management program content and the state, industry and local existing standards, norms have inconsistent or inconsistent, should be in accordance with the state, industry and local standards, norms related to the implementation. 6, the construction should be carried out according to the design drawings and construction stage, design drawings must be approved by the review before being put into construction. Such as the discovery of design drawings and the
您可能关注的文档
最近下载
- 中国石化工程建设标准建设项目hse管理手册、管理程序、作业指导书_.docx VIP
- 统编版2025年专题07 修辞与仿写 五升六语文暑假专项提升试卷.pdf
- 烟气热值计算.xls VIP
- 必威体育精装版ISO9001-2015质量管理体系及FCCA质量技术验厂全套文件.docx
- 升罐乙烯发生器说明书.docx
- 辽宁城市道路挖掘修复费收费标准.doc VIP
- 【中小学】上下册第二章第三节第3课时 黄河的治理和开发课件公开课教案教学设计课件.pptx VIP
- SK水环真空泵说明书.docx VIP
- 2025至2030中国动力电池回收利用产业链价值与政策环境研究报告.docx
- 人工智能有效赋能高中历史教学实践.pdf VIP
有哪些信誉好的足球投注网站
文档评论(0)