高下压配电装配运作平安法度模范(国外英文资料).docVIP

高下压配电装配运作平安法度模范(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高下压配电装配运作平安法度模范(国外英文资料)

高低压配电装置运作安全程序(国外英文资料) This article is contributed by yangxh765121 DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. High and low voltage power distribution equipment operation safety procedures for the protection of the operator and maintenance staff in high and low voltage equipment maintenance safety engineer should refer to the following high and low maintenance procedures to reduce the operator and maintenance staff of industrial accidents caused by misunderstanding or negligence, and guarantee the reliable and safe building equipment. First, the power supply and distribution personnel on duty, power distribution, duty personnel must strictly abide by the employee manual and regulations. Two, duty personnel, duty personnel must have qualified technical documents, proficiency in this property power supply mode, line and equipment technical performance, and have actual handling accident ability, can mount guard work. To check the following distribution device operation three, distribution device before: 1. all porcelain clean and no crack prevention facilities are intact, doors and windows. 2. screen meter indicator and various devices display normal. 3. bus clean, no debris, good contact, measured bus insulation resistance normal, not less than one trillion euro per thousand volts. 4. bus, transformer two line and ground line should be firmly connected, integrity is not loose, a measure of insulation qualified, two tested should be well grounded. 5. the porcelain bushing of the arrester shall be clean and free of cracks and the wiring and grounding wire will be in good condition. 6. the outer shell of power capacitor should be free from expansion and leakage, and the insulators are intact and fuse well. Four inspection and normal operation of the provisions of 1. every two hours inspection again and make a list of records, including power meter, reactive power m

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档