- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价人员实战工作中容易遗漏项目(国外英文资料)
造价人员实战工作中容易遗漏项目(国外英文资料) (including civil engineering, installation) The budget figure is mainly in the construction drawing project to do, dont pull a visa on the spot. General major can be the boss If the small ones dont pay attention, do it. 1, in the flat roof insulation roof row of steam hole project. 2. The embedded iron parts in the stair railing. 3, paint, paint scaffolding project. 4, precast slab beam concrete: plate beam head concrete, transportation, installation 5, bored piles: drilling depth into the rock (the project Municipal and highway quota project contains a large gap in content) 6, indoor pipe installation blowing project is easy to miss; 7. Extra high cost of outdoor pipe installation; The material cost and production of 8, the angle of installation project; 9. The coefficient of unilateral earthwork of trench earthwork is easy to omit; 10, the artificial coefficient of outbound soil forget to multiply; 11, cables, wires and other items on the list is only to provide a net amount of work, in the group price, but also with reserve, bending, loss, length Degree; 12 、 in the distribution cabinet installation list, the basic steel is easy to leak; 13 、 water supply and drainage on the pipe installation list, the sleeve is easy to leak; 14, the wind pipe through the wall plugging. 15, control valve test, irrigation temporary short tube production and installation. 16, equipment installation, lifting equipment, elimination. 17. The bolts installed on the flanges in the process piping are non valuation materials. 18, installation part: high-rise building additional cost calculation of the base, including 6 or less than 20m of all labor costs. High-rise building When the building is in line with the super high construction condition, the additional cost and the extra high increase fee of the high-rise building are calculated together. 19, roof line, cover plate! Mainly scattered parts! 20, some scattered small components, concrete easy to leakage; 21, t
您可能关注的文档
最近下载
- 湖南农大《作物栽培学》各论-玉米栽培.ppt VIP
- 在线网课学堂《食品毒理学(天科)》单元测试考核答案.pdf VIP
- 中国传媒大学-实用播音教程-普通话语音和播音发声(一)-课件.pptx VIP
- 2025中国资源循环集团有限公司子公司纪委书记岗位招聘8人笔试参考题库附答案解析.docx VIP
- 2025中国资源循环集团有限公司子公司纪委书记岗位招聘8人考试备考题库及答案解析.docx VIP
- 在线网课学堂《课堂教学能力综合训练》单元测试考核答案.pdf VIP
- 2025中国资源循环集团有限公司子公司纪委书记岗位招聘8人笔试历年参考题库附带答案详解.docx VIP
- 消化道出血课件总结.pptx VIP
- 北师大版八年级上册数学《一次函数的应用》一次函数教学说课课件.pptx VIP
- 新系列建筑标准设计图集目录.pdf VIP
有哪些信誉好的足球投注网站
文档评论(0)