- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浙大《工程管理专题》离线作业(国外英文资料)
浙大《工程管理专题》离线作业(国外英文资料) Zhejiang University project management special topic offline homework Case study questions (5 questions, 20 points each) (a) a construction company (Party B) signed a construction contract with a factory (Party A) in April 20th with a construction area of 3000m3 industrial workshop (with basement). The construction plan and schedule approved by Party B have been approved by the engineer. The earthwork quantity of foundation pit excavation of the project is 4500m3, assuming the direct cost is 4.2 yuan /m3, and the comprehensive rate is 20% of the direct cost. The foundation pit construction scheme: the earthwork using lease a bucket capacity for backhoe excavator construction 1m3 (rent 450 yuan / number). Party A and Party B agreed to start in May 11th and completed in May 20th. In the actual construction, the following events took place: (1) for leasing excavator overhaul, late start 2 days, resulting in 10 working days idling. (2) in the course of construction, due to the soft soil layer, received the supervision engineer May 15th stop instruction, geological review, with 15 working days. (3) in May 19th, the supervision engineer received a return order in May 20th, and at the same time raised the design change notice for the excavation depth of the foundation pit to increase the earthwork excavation amount by 900m3 2m. (4) on May 20th ~22, the heavy rain forced the excavation to be suspended. By idling 10 working days. (5) May 23 daily 30 days repair blunt bad permanent way, in May 24th to restore the mining work, the final pit in May 30th to dig. Question: (1) the construction company may claim compensation from the manufacturer for any of the above events; which events cannot claim and explain the reasons. (2) how many days do you claim for each event? How long is the total duration claim? (3) assuming that the labor cost is 23 yuan / day, and that the increase of labor cost is 30% of the labor cost, how much is the reasonable cost claim?
文档评论(0)