- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
川大11春工程估价2414第一次作业(国外英文资料)
川大11春工程估价2414第一次作业(国外英文资料)
Project evaluation 2414 first operation
First, a radio question
1. construction and installation tax refers to ().
A. sales tax
B. urban maintenance and construction tax
C. Educational Surcharges
D. ABC3 comprehensive tax
The correct answer: D
2., if a project has doubled its design and production capacity on its original basis (n = 0.6, f = 1), the amount of investment will increase.
A. 100%
B. 60%
C. 30%
D. 50%
The correct answer: D
3. an artificial excavation, unit output quota for 2.5m3/ days, the time fixed for the ().
A. 0.4 days /m3
B. 0.5 days /m3
C. 0.25 days /m3
D. 2.5 days /m3
The correct answer: A
4. the construction cost increases during the night.
A. direct engineering cost
B. measures fee
C. fees
D. enterprise management fee
The correct answer: B
5. the quota used for the construction budget is ().
A. budget quota
B. construction quota
C. budget quota
D. labor quota
The correct answer: B
6. according to the standard for valuation of quantities in construction projects, the following options are listed as non adjustment lists.
A. sub item volume list
List of B. measures items
List of C. measures items
D. fees
The correct answer: A
7., in the feasibility study phase of the project construction, the corresponding cost is called ().
A. estimated cost
B. budget cost
C. investment estimate
D. tender offer
The correct answer: C
8. the project supervision fee shall be included in ().
A. overhead
B. reserve fee
C. other fees for engineering construction
D. construction and installation costs
The correct answer: C
9. in calculating the amount of work on the foundation of an exterior wall brick, its length is (...).
A. outside wall outer line
B. inner wall edge line
C. net length of inner wall
D. centerline
The correct answer: D
10. in the following cost, the closest to the actual cost of the project is ().
A. completion settlement
B. investment estimate
C. design budget
D. construction drawing budget
The correct answer: A
Two multiple
您可能关注的文档
最近下载
- 草牧场转让合同5篇.docx VIP
- (四级)保育师理论学习考试题库(浓缩300题).docx VIP
- 2025四级保育师资格考试题库及答案(浓缩400题).docx VIP
- 实施指南《GB_T10068-2020轴中心高为56mm及以上电机的机械振动振动的测量、评定及限值》实施指南.docx VIP
- 中小学生常见病防治课件.pptx VIP
- 1.1 原始社会的解体和阶级社会的演进:原始社会 课件-【新教材】高中政治统编版(2019)必修一(共29张PPT).pptx VIP
- 铝方通吊顶施工技术交底.pptx VIP
- DB23T1501-2013 水利堤(岸)坡防护工程格宾与雷诺护垫施工技术规范.pdf VIP
- 华为极简站点解决方案opm200.pdf VIP
- 北师大版七年级数学下册第二章测试题及答案下载.doc VIP
文档评论(0)