- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
家装施工工序(国外英文资料)
家装施工工序(国外英文资料)
Usually Jiezhuang project consists of hydropower engineering, engineering, engineering, Mason woodworking paint engineering and installation engineering.
Jiezhuang project general steps for:
1, by designers, project managers, construction personnel and the owner of the site to show, to construction, Party B clear the project after the construction.
2. The hydropower station enters the pipeline, carries out the pipeline, the wiring, makes the water and the drainage project, after completes the hidden project inspection and acceptance, carries on the next step procedure.
Hydropower is Jiezhuang hidden works links, in addition to not cut corners, outside of the Chong excellent workmanship is not sloppy, this is only for your reference circuit installation drawing decoration, hoping to help.
Master bedroom air conditioning installation one loop;
Installation of primary air conditioning circuit;
Study air conditioning installation a loop;
The kitchen installs a loop;
Install a loop in the secondary toilet;
Install a loop in the main toilet;
A socket for the living room, dining room, aisle;
The lighting system of living room, dining room, corridor, background wall and ceiling is installed.
3, carpentry approaching, Mason woodworking project approach, according to the drawings, Mason waterproof requirements, must also check whether there is water, downstairs Water Leakage phenomenon, can be carried out under the step.
4, paint engineering approach, engineering construction, paint paint.
5 、 installation work before installing the floor, and then install the floor.
Hydropower project
1, in the electrical construction before the test circuit, to the general trend of waterway, line pipe and the water pipe can not cross phenomenon, can not go below the floor water, kitchen and bathroom tiles below not cable pipe and wire.
2, in the case of composite floor, the ground must be dug, cement leveling; in the case of solid wood flooring, line pipe can be consistent w
您可能关注的文档
最近下载
- ISO9001+ISO14001+ISO45001质量环境和职业健康安全三体系内部审核检查记录表.docx VIP
- 2022年9月全国事业单位联考《综合应用能力》A类 真题及答案.pdf VIP
- UL各类线材详细规格大全.docx VIP
- 研究者发起的临床研究的医疗卫生机构管理实施细则及编制说明.pdf VIP
- GB50325-2020 民用建筑工程室内环境污染控制标准.docx VIP
- 慢性鼻窦炎诊断和治疗指南(2024).pptx VIP
- 全院血糖管理-马建华.pptx VIP
- HIGEN 海坚FDA7000伺服驱动器用户手册.pdf
- 入党志愿书模板(空白完整版).doc VIP
- 工业产品销售单位落实质量安全主体责任相关制度(全套模板).pdf VIP
文档评论(0)