- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
修建施工手册系列之 施工组织设计 附录I 超高层修建施工组织设计纲目(国外英文资料)
建筑施工手册系列之 施工组织设计 附录I 超高层建筑施工组织设计大纲(国外英文资料)
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Appendix I
Example of construction organization design of super high-rise building
Construction organization design outline of a science and Technology Building -- Outline of construction organization design of a science and Technology Building
I. General Situation of the project
This project is located in the city zone of the Yellow River road and Huashan road junction. The project covers an area of 12500m2, total construction area of 65090m2., construction area of 53090m2, technology market and technology R D industry housing; underground construction area of 12000m2, for the garage and equipment room. The building 30 floors on the ground, the total height of 110m, as shown in figure 34-47.
Figure 34-47
Floor plan and sectional drawing of a technology building
Based on 80cm thick plate resistance, box foundation composed of 30cm thick concrete wall and 40cm thick laminate. The basis for the air defense for the 1m thick concrete cushion, based on depth of 9.6m, and JIA. The main waterproof layer for cast-in-situ precast beam column frame shear wall structure, according to the seismic intensity of 8 levels of fortification walls. As a bar hanging plate. The standard column node. The cast-in-place column concrete strength grade is C30, can be installed at 5MPa precast beam; precast beam must be added under the temporary support for the composite beam concrete strength to meet the design requirements of 100% rear removable cast-in-place column. F