“印象西湖”揭开神秘面纱(国外英文资料).docVIP

“印象西湖”揭开神秘面纱(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
“印象西湖”揭开神秘面纱(国外英文资料)

“印象西湖”揭开神秘面纱(国外英文资料)Impression West--------------------------------------------------------------------------------November 2006 03, 174525 Hangzhou networkAfter the renovation of the loyal-hearted archYue LakePart of the collapsed, retractable grandstand is hidden in this bamboo.The impression West Lake, which Zhang Yimou calls the soul of releasing West Lake, has been caught in the question of environmental protection, and today it has unveiled a mysterious veil to the news media. Environmental protection type underwater lifting stage, folding type ladder stand, ship loadingStep on the stage, listen to the speakers, the audiences independent headphones, hidden lights...... These elements make impression West Lake merge with West Lake. At present, the impression of West Lake to perform the required hardware facilities, environmental remediation work completed, has entered the rehearsal stage, is expected to officially opened in March next year.Impression West Lake let Yue Lake water transparency increased by 18CMImpression West Lake is located in the Yue Lake area where the downtown area is quiet. This area is the only area in West Lakes large-scale dredging project that has not undergone thorough dredging. In accordance with the relevant regulations, in October 2005, the Hangzhou Water Management Office approved the Hangzhou impression West Lake company to carry out the cofferdam for Yue lake. After completion of the cofferdam at the end of the year, dredging began. Dredging was completed in October and cofferdam removed in June 2006.Yue Lake after the thorough dredging of the sediment, according to the detection, the water transparency of Yue Lake area increased from the 70CM before dredging to the 88CM after dredging.In addition, the West Lake impression project in environmental remediation, the Yue Lake and the surrounding businesses re planning, the store and refurbished, unified architectural style; the transformation of the infrastructure, such as the compre

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档