- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
机电技术要求中译英翻译版本
机电技术要求中译英翻译
——华译网翻译公司提供中英文翻译版本
文献来源:华译网翻译公司官方网站/
注:。详细价格和译者资质以及论文翻译控制流程请登陆其官方网站。
华译网翻译公司提供专业学术资料、法律资料、商务资料和技术资料翻译服务,本文件我们为某机械翻译的文件摘录内容,供参考,欢迎惠顾。
2. After the raking strut and cross beam is connected to the connection plate by the bolt, adopts the three-side all-around-weld in site; the corner of all all-around-weld should be welded continuously, the height of fillet weld is 8mm; the welding place of the upright top plate and cross beam should be polished after the assembly in site;
3. The welding seam of the steel structure must not have the deficiency of crack, pore and slag inclusion etc.;
4. The integral vertical allowable tolerance of the main structure of the steel structure is 2.1mm; the integral plane bending allowable tolerance of the main structure is 2.4mm.
5. Total weight of steel structure: 10,512kg.
立柱与横梁连接之板块方位示意图
本图为立柱安装示意图,立柱在整体拼装时,连接板方向应严格按照图示方位布置.
Position figure of connecting plate of upright and cross beam
The figure is the installation figure of the upright; the position of the connecting plate should be in arranged according to the position shown in figure strictly during the integral assembly of the upright.
技术要求
1.制造和安装应符合BZQ(TJ)0048-94《钢结构
制造和安装施工规范》中的要求。
2.法兰间采用%%c10mm硅酸铝绳进行密封,并要求法兰连
接时确保其密封性,不得有漏气现象存在。
3.电机为防爆电机4Kw。电压等级AC440V/60HZ。
4.卸灰阀出灰口配一法兰。
5.卸灰阀组件单台设备一套。
Technical requirement
1. The manufacture and installation should be in accordance with requirement in BZQ(TJ)0048-94 Specification of Manufacture and Installation Construction of Steel Structure.
2. It should adopt the %%c10mm aluminum silicate rope for sealing between the flanges; it should ensure the tightness during the flange connection and must not have the air leakage.
3. The motor is the explosion-proof motor 4Kw. The voltage is AC440V/60HZ.
4. The ash hole of the cinder valve is equipped with a flange.
5. A set of cinder valve assembly single equipment.
技术要求
1、各斜梯与平台采用螺栓连接固定,全部栏杆固定现场采用螺栓连接;
2、现场各平台安装就位后,应与支撑梁或平台支撑采用连续焊接,焊角高6mm;
3、钢结构焊缝处不得有裂纹、气孔、夹渣等缺陷;
4、所有平台均采用钢板网铺设,爬梯踏