风险告知(外国英语资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
风险告知(外国英语资料)

风险告知 Security risk notification Numbering: Dear sir / madam: You in my project is to be engaged in high slope treatment work, in order to enable you to better understand the security risks existing in the work and the right preventive measures and emergency measures, especially the preparation of the safety risk of this book, please carefully read and understand, if you have any difficulties or doubts, please put forward to us full-time the safety officer, they will patiently explain to you. If you are sure that you have a clear understanding of the security risks involved, please sign your name and print your signature at the bottom. Security risk notification First, the existence of dangerous sources and preventive measures Serial number Hazard Potential accident Precautions I II One High stones and dangerous stones After trampling artificially, the original soil was washed after rainstorm Object strike Before the slope treatment, the stones and stones should be cleaned first, and reliable work protection shall be taken. The situation of the surrounding rocks around the dangerous stone should be observed during the operation, and the operation shall be done step by step without cross operation. Two Artificial cleaning slope At the foot of the stampede regolith Turquoise ta Falling high Cleaning should pay attention to the foot, in the surface shall be reinforced or clear turquoise, local excavation step to clean up, if necessary, adding the vertical steel tube handrail. Three Mountain instability Continuous heavy rain, earthquakes, blasting excavation, resulting in mountain imbalance Landslide, collapse The slope displacement observation is carried out by setting datum points and total stations, and it is found that the displacement mountain should adopt anti slide treatment measures before slope treatment can be carried out. Four Bracket disassembly and assembly Improper operation Object strike Falling high The disassembly and assembly of brackets shall be carri

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档