- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土木第一章作业(国外英语资料)
土木第一章作业(国外英语资料) Chapter 1 exercise 1 The filling volume of a site with 4000m3 is required to be filled from nearby soil and its soil is compacted sand and clay: The amount of excavation backfill; What is the number of vehicles to be transported if the bucket capacity of transport is 2m3.? Solution: Table 1.1 sand clay is taken as three types of soil, KS = 1.24~1.3, kS =1.05~1.07 When computing, if you take the big value, then KS take 1.3, kS, take 1.07 Set the amount of excavation filling for V (V1), dig the formula KS = V2/V1, KS = V3/V1 It was by: V3 = 4000 KS = V3/V1 1.07 = 4000/V1 V1=3738.32 (M3), that is, the amount of excavation is 3738.32 m3. V2=V1 * KS=3738.32 * 1.3=4859.82 N=v2/2=2429.91 take n=2430 (car) Chapter 1 exercise 2 The known site after the formation of the ground elevation is 225, the trench bottom elevation is 222, 2 meters wide, hard plastic loam soil, artificial digging and soil thrown at the top. The upper width of trench trench trench, and draw the plan and section. Solution: H = 225-222 = 3 (meters) Look up table 1.5 Hard plastic sub clay, static loading, m=0.5, dynamic loading, m=0.67 Static loading B=m * H=3 * 0.5=1.5 (m) Mouth width 2+1.5 * 2 = 5 (meters) Chapter 1 exercise 3 The central line of a trench is shown as shown in figure AB, 30m apart, BC apart from 20m, and the soil is clay. The design level of the bottom of the A point is 260. The vertical gradient of the bottom of the ditch is from 4 to C per thousand, and the width of the bottom of the ditch is 2m. A is designed to be excavated by backhoe, and the earthwork of AC section is calculated. Answer: bottom 260 A point Delta HA=262.5-260=2.5 (m) B point Delta HB=262.0- (260-30 * 0.004) ==2.12 (m) C point Delta HC=261.5- (260-50 * 0.004) =1.7 (m) Backhoe load m=0.67 A point bottom width 2+2 * 2.5 * 0.67 = 5.35 B point bottom width 2+2.12 * 2 * 0.67 = 4.84 C point bottom width 2+2 * 1.7 * 0.67 = 4.278 A point area AA = 0.5 * (2+5.35) * 2.5 = 9.19 B point area AB = 0.5 * (2+4.84) *
您可能关注的文档
- 办公软件应用技巧之PPT(国外英语资料).doc
- 初二数学练习题8509(国外英语资料).doc
- 办公软件应用技能培训和鉴定录入文章(中级)200711(国外英语资料).doc
- 办公题解(国外英语资料).doc
- 功率曲线的修正(国外英语资料).doc
- 加工中几种不同的进刀方式(国外英语资料).doc
- 加工中心中几组常用指令的区别及编程技巧(国外英语资料).doc
- 加工中心编程说明资料2(国外英语资料).doc
- 加工英语对照(国外英语资料).doc
- 加强三江源地区盐渍土路面的养护及防治病害的措施(国外英语资料).doc
- 中学生化学学习兴趣动态建模与人工智能教学策略创新教学研究课题报告.docx
- 基于教师教学画像的教师教学评价体系构建与应用研究教学研究课题报告.docx
- 高中生用化学方法鉴别不同产地咖啡豆中绿原酸与叶绿素含量关联性分析课题报告教学研究课题报告.docx
- 2025年中医药药食同源产品知识产权保护策略.docx
- 《2025年居家养老辅具租赁服务模式》.docx
- 人工智能助力初中生科学探究学习动机维持策略探讨教学研究课题报告.docx
- 数据驱动的高中课程资源整合与创新教学策略探究教学研究课题报告.docx
- 《2025年智能宠物喂食器在宠物医院护理应用分析》.docx
- 跨境电商平台2025年节日活动用户体验AB测试优化报告.docx
- 2025年生鲜冷链多温区配送车辆调度优化报告.docx
有哪些信誉好的足球投注网站
文档评论(0)