伴奏伴奏(国外英语资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
伴奏伴奏(国外英语资料)

伴奏伴奏(国外英语资料) 1. Building construction contracts: A. Party A: Zhang Xiaowen????????????????? B: First: building address: Bai Zhen Second market. The building a total of two four and a half (600 square meters), the building is semi cement concrete frame structure, one to three layers for empty box design, set up a bathroom on each floor, a floor, a wall, designed for residential four and half layer, a total of three bathrooms, concrete construction the standard of the design drawings. Second: Party A shall provide water and electricity and purchase all construction materials to the construction site. Party B shall be responsible for the construction. Third: Party B provides templates, top sticks and all construction tools and equipment. ? fourth: the building foundation excavation backfill by Party A is responsible for the rest of the building, construction by Party B, Party B shall be responsible for the specific contents are as follows:? 1, construction and decoration of four layers of the main building, septic tanks, drainage, sewers and sewage pipe installation. 2, stair corridor wall is considerate 1.2 meters tall tile, stair stair sticks step ceramic tile. ? 3, one to three layers of empty box, ground tiles, attached to the anchor line, the inner wall and the bottom surface of the ordinary building decoration, (the school of water and sand lime wall), the bathroom floor tiles, wall tiles affixed to 1.2 meters high. ? 4, four storey residential hall, room, kitchen, dining room, balcony tiles, attached to the anchor line, kitchen, bathroom, dining room wall tiles to considerate, the rest is thick bottom wall and floor. (i.e. cement mortar platoon swing). 5, the upper half floor: the room sticks the floor brick, sticks the foot line, the bathroom floor, sticks the ceramic tile, the wall sticks 1.2 meters high tile, and other walls are the general decoration. (the school of cement lime wall). ? 6, top drift outside 0.2 meters, 1 meters high fence, guardrail wall an

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档