五大员考试试题(国外英语资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
五大员考试试题(国外英语资料)

五大员考试试题(国外英语资料) 2011 builder simulated test questions First, fill in the blanks (10 questions, 2 points each) 1, the three elements of force are, and sum. The line of force refers to the force. 2, seasonal construction mainly refers to the construction process. 3. When pouring concrete, the free falling height shall not exceed meters, and shall not exceed meters in vertical structure. In case of excess, it shall be adopted to prevent concrete from occurring. 4. The reinforced concrete structure is composed of several sub projects. 5, technical disclosure means that the master thought that auxiliary, supplemented by necessary, the two sides should transfer. 6 、 steel bar joint connection method has, and. 7. The pouring of mass concrete structure can be divided into the pouring plan according to the structural characteristics. 8, concrete inspection and evaluation are divided into two kinds of law. 9, waterproofing works according to their use of materials can be divided into two categories. 10, the main form of brick masonry,,. Two, radio questions (a total of 10 questions, 2 points per subject) 1. The standard specimen used to determine the strength of concrete is () mm. A. 70.7 x 70.7 x 70.7 B. 100 x 100 x 100 C. 150 x 150 x 150 D. 200 x 200 * 200 2, the total width of the building is 13m, the roof slope of 2% (double slope, horizontal), the roof should rise in the middle height is A B, 130 mm, 150 mm, 200 mm C, 260 mm D 3, the structure has seismic requirements, and its stirrups, curved hook straight part length should be at least A, 3D, B, 5D, C, 6.25d, D, 10D 4, for the anti-seepage requirements of concrete curing time should not be less than () A, 3 days, B, 7 days, C, 14 days, D, 28 days 5, reinforced concrete structure construction, construction joints should be left in the structure by () smaller and easy to construction site. A pressure, B shear, C tension, D stress 6, in order to adjust the setting time of Portland cement, often add appropriate amount ()

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档