- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
VC常见的108个问题(国外英语资料)
VC常见的108个问题(国外英语资料) Disaster and disaster relief of continuous wall Shen Maosong / Professor, Department of civil engineering, national Kaohsiung University of Applied Sciences The standard penetration test and the number of NSPT is less than or equal to 4 moisture content than liquid limit LL soft clay silt with NSPT less than 10 of the loose sand sites, and more than two kinds of soil layer into the site, or collapse hole in the continuous wall construction, and with the continuous wall of concrete mixing, resulting in a continuous wall, mud bag bag, mixed mud and sand clods of the chain of Engineering disaster. The site of continuous wall cladding can be classified as four A, B, C and D sludge sites. The catastrophic time of retaining excavation is judged by an example. The failure time of clay clay swelling is about 12~13 hours, and the time of sand drift for sandy soil is about 1 hours. The continuous wall site in addition to underground excavation occurred when mud packs damaged, damaged adjacent engineering disaster, continuous wall is designed for permanent basement exterior wall structure of the site, after the project is completed and in use for many years after the building, will damage and damage disputes. In this paper, a case study is carried out to analyze the engineering disaster after the continuous wall breach and the emergency relief method on site, so as to accumulate the knowledge of emergency rescue of basement engineering, and to serve as a reference for retaining excavation excavation. Shen Maosong [1] pointed out that as an underground continuous wall excavation of temporary retaining wall, even as a permanent wall structure design used in the basement, the soil is loose, will produce a package of mud, dirt, mud and mixed bag sand and other chain engineering disaster, and continuous wall in different periods of mud pack seepage damage the disaster caused by the project, such as roads, the adjacent building base near the settlement and dumpin
您可能关注的文档
最近下载
- Web报表工具FineReport的JS API(一).pdf VIP
- Web报表工具FineReport中JavaScript的使用.docx VIP
- Web报表工具FineReport的JS API开发(二).pdf VIP
- (高清版)ZT 0142-2010 航空磁测技术规范.pdf VIP
- 肖申克的救赎经典台词肖申克的救赎经典语录中英文对照.docx VIP
- 张恩利-体育俱乐部的经营与管理(运训).ppt VIP
- 新改版教科版三年级上册科学全册知识点梳理与总结.doc VIP
- DB65T2052-2011 库尔勒香梨贮藏保鲜技术规程.pdf VIP
- Web报表工具FineReport的JS开发之字符串.pdf VIP
- 《商务英语翻译》课件——产品说明的翻译原则2.pptx VIP
文档评论(0)