- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2009年二级建造师《机电工程》考题及答案(国外英语资料)
2009年二级建造师《机电工程》考题及答案(国外英语资料)
2009 annual national construction division two qualification examination papers
Professional engineering management and Practice (mechanical and Electrical Engineering)
First, individual choice questions (20 questions, l points per subject). Each item options, only l most to do)
1. in mountain areas, cableway hoisting equipment is used more often (B).
A. sliding hoisting method
Hoisting method of B. over high inclined cable
C. universal rod hoisting method
D. rotating lifting method
2. if no proper protective measures are taken, the welding operation shall be stopped immediately (C).
The relative humidity of A. reached 80%
B. adopts arc welding, and the wind speed reaches 6m / S
C. adopts CO2 gas shielded welding, the wind speed reaches 2m / S
D. the weather is very hot and the surface temperature is 38 degrees centigrade in the sun
3. the correct order of the building heating pipe installation procedure is (B).
A. system cleaning, piping system test, corrosion protection, heat insulation, final acceptance
B. piping system test, corrosion protection, insulation system cleaning, final acceptance
C. piping system test, accessory inspection, anticorrosion, thermal insulation, final acceptance
D. corrosion protection and insulation pipeline system test system cleaning, final acceptance
4. if the whole building share a ground system, its grounding resistance value should meet the requirements of grounding resistance (B) of different professional grounding devices.
A. specification value
B. minimum
C. mean
D. maximum
5. if the design of the air duct thickness of the exhaust system is not required, the thickness of the air duct pipe can be selected according to (D) system.
A. negative pressure
B. low voltage
C. medium pressure
D. high voltage
6. after the completion of the construction of the building fire acceptance, should check whether the fire facilities configuration meets (A) requirements.
A. approved fire control design
B. project can b
您可能关注的文档
- 001华旗资讯公司介绍(国外英语资料).doc
- ...winter 09电路设计案例教程》-第20讲 10.5 PCB板设计技巧_百度文库...(国外英语资料).doc
- 002-140804-[读书]嫉羡、嫉妒与贪婪(国外英语资料).doc
- !!B4 20世纪欧美文学(国外英语资料).doc
- .net多线程学习(国外英语资料).doc
- - CAD笔记本。(国外英语资料).doc
- 002机械挖土施工工艺(国外英语资料).doc
- 001人工挖土施工工艺(国外英语资料).doc
- !!各种身材穿牛仔裤的讲究vs了解羽绒服(国外英语资料).doc
- 01.班主任兵法系列一、引言(国外英语资料).doc
- 2009年报 价 表(国外英语资料).doc
- 2009年必威体育精装版考研数学大纲(数学一)(国外英语资料).doc
- 2009年电子音乐界虽然出现了猛炒冷饭的现象,但是依然还是有不少精彩的作品出炉,我们不对大师致敬,但是我(国外英语资料).doc
- 2009年普通高等学校夏季招生考试(安徽卷)_9-23(国外英语资料).doc
- 2009年上海高考物理试题答案(国外英语资料).doc
- 2007最经典的连珠妙语录(国外英语资料).doc
- 2009年定西市中考数学试卷(国外英语资料).doc
- 2009年钦州市中考数学学科质量分析(国外英语资料).doc
- 2006年考研数学二试题及答案doc target=_blank(国外英语资料).doc
- 2009财富500强394-500(国外英语资料).doc
文档评论(0)