13春学期《土木工程施工(二)》在线作业3(国外英语资料).docVIP

13春学期《土木工程施工(二)》在线作业3(国外英语资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
13春学期《土木工程施工(二)》在线作业3(国外英语资料)

13春学期《土木工程施工(二)》在线作业3(国外英语资料) Northeastern University, 14 spring, 13 autumn, 13 spring semester, civil engineering Northeastern University, 14 spring, 13 autumn, 13 spring semester, civil engineering construction (two), online homework, 3 Total score: 100 test time: - Radio examination Radio examination questions (20 questions, 100 points) 1.. In the following description of the drawing rule of the double code network diagram, what is correct is that. A. allows nodes to be of the same number B. allows multiple start points C. allows logical loops to appear D. allows only one endpoint Full marks: 5 2., the construction of cast-in-place arch bridge, the design of arch axis and construction arch axis relationship is. The arch axis of A. construction is equal to the design Arch Axis The arch axis of B. construction is lower than the design Arch Axis The arch axis of C. construction is higher than the design Arch Axis D. construction of arch axis should be designed on the basis of arch axis, considering the type of support, after loading a comprehensive determination of arch Full marks: 5 3. the internal vibrator shall be arranged in row or staggered arrangement, and the spacing between the insertion points shall be the radius of the vibrators action. A. 0.9 - 1.1 times B. 1.2 - 1.5 times C. 1.4 - 1.5 times D. 1.5 - 1.8 times Full marks: 5 4. single thick bar tension anchorage. A. screw end rod anchor B. pier head anchorage C. JM type anchorage D. steel cone anchorage Full marks: 5 5. concrete maintenance during which. Watering times. A., 6 - 8 hours B., 4 - 6 hours C. water 4 to 6 hours during the day and 6 to 8 hours at night D. according to climatic conditions, to ensure that the concrete moist Full marks: 5 6. which of the following requirements regarding the construction segment is not correct?. The boundaries of the A. construction section shall be as close as possible to the structural boundaries of the construction object The amount of labor consumed in each con

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档