软基处理粉喷桩施工控制(国外英文资料).docVIP

软基处理粉喷桩施工控制(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
软基处理粉喷桩施工控制(国外英文资料)

软基处理粉喷桩施工控制(国外英文资料) Construction control of soft foundation treatment powder spraying pile Wangrongqin (Jiangxi highway and Bridge Engineering Bureau, Nanchang 330000) Abstract: Aiming at the soft soil road high fill subgrade settlement is difficult to control, through the soft soil foundation treatment of DJM pile Ma Wu highway The successful practice aims to introduce the experience gained in the construction of the powder jet pile and various testing methods. Key words: road engineering; soft foundation treatment; powder injection pile; control 0 Preface The K36+050-K38+652 section of Ma Wuhu Expressway belongs to the lower reaches of the Yangtze river. The formation of this soft soil is complicated, and it is composed of multi-element soil structure. The spatial distribution is different and the horizon is complex. The thickness of soft soil varies greatly and varies greatly in nature. According to the exploration of the foundation along the line, it is divided into three geological layers: I layer, soft plastic, low liquid limit clay, continuous distribution and depth 0-2.3m. The II layer is dominated by flowing plastic mud and low liquid limit clay, and the local is silty silty clay with low liquid limit. It is sandwiched between low liquid limit silty sand and low limit clay, and the depth is about 2.3-7m. The III layer is mainly made of soft, hard plastic and low liquid limit clay, sandwiched between dense and low liquid limit silty sand. The compressibility is low and the depth is about 7-14m. Through the calculation and analysis of deep foundation treatment in small structures and bridge abutment, design using powder jetting mixing pile (dry) soft foundation treatment, to control the structure through the spacing of DJM pile settlement after construction. 1 construction principle 1.1 original foundation structure The structure of the original foundation shows that the natural water content and the natural void ratio are too large, which makes the bearing c

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档