- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
装饰装修工程2012年测试题(国外英文资料)
装饰装修工程2012年测试题(国外英文资料) In 2012, Cost Clerk examination Decoration Engineering self-test questions (1) 1., quantity and price combine, price in the separation of quantity and price refers to () A. labor costs, material costs, B. labor costs, mechanical costs C. enterprise management fees, profits, D., material costs, profits 2. () refers to the construction process, the completion of the contract submitted by the project other than the construction of sporadic projects or work, according to the agreed agreed comprehensive unit price. A. B. senior workers intermediate lower C. D. daywork 3. the fees shall be paid in accordance with the regulations of the provincial government or the relevant departments at the provincial level. A. construction enterprise B. owner unit C. the contracting party D. sends and contracts both parties 4. the bidder carries out the bidding quotation on the basis of (the), and does not have the obligation to verify the bill of quantities, and does not have the power to modify and adjust the bill of quantities. A. quantity list, B. bidding control price, C. bidding price, D. completion settlement price 5. () is the basis of performance of contractual obligations. A. engineering content, B. work content, C. project characteristics, D. engineering quantity 6. () determine the size of a sub item list and the value of the project. A. engineering content, B. engineering quantity, C. measurement unit, D. project features 7. the following fees are not included in the fees of other items. A. general contracting service fee B. provisional valuation C. fixed asset use fee D. provisional sum 8. within the scope of the general contract, the responsibility for the quality, safety and duration of the project is centralized, and all belong to (). A. employer, B. contractor C. tenderee, D. general contractor 9. the consultant who has obtained the qualification for the consultation of the cost of a construction project may undertake the bidding control price of
文档评论(0)