- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
煤矿开采(国外英文资料)
煤矿开采(国外英文资料) 1. coal field: large area of coal bearing 2. Ida: the part of a coal mine that is divided into a mine 3. mine production capacity and type: (1) according to the production capacity of the mine, the mine is divided into large, well known mistress types. (2) mine year Production is the amount of coal produced in the mine every year. Generally small mine pit length is not less than 1500m; medium-sized mine is not less than 4000m; large mine is not less than 7000m. 3. types of mine roadway: vertical tunnel, horizontal tunnel and inclined tunnel. 4., approved production capacity: the approved comprehensive production capacity is called the approved production capacity. 5., according to the different production capacity, China has divided the mine into three types: big, small and medium. The large mine: 1.20Mt/a, 1.50Mt/a, 1.80Mt/a, 2.40Mt/a, 3.00Mt/a, 4.00Mt/a, 5.00Mt/a and 5.00Mt/a above the mine; the medium: 0.45Mt/a, 0.60Mt/a, 0.90Mt/a mine; the small mine: 0.90Mt/a, 0.15Mt/a, 0.21Mt/a and 0.30Mt/a. 6. annual production capacity of mine: the amount of coal produced by the mine every year, expressed as 10000 t or Mt. Annual production refers to the amount of coal actually produced annually. The value is often different from that of the mine, and the annual output is often unequal. 7., the biggest economic stripping ratio: the cost of coal mining by stripping ratio is not greater than the cost of underground mining. 8. classification of mine roadway: vertical tunnel, horizontal tunnel and inclined tunnel. 9., dark shaft: also known as blind shaft, blind shaft, is not directly connected with the ground of the vertical tunnel. 10., dark slope: not directly connected with the ground inclined shaft. 11., mainly down the mountain: service to a mining level of the inclined roadway. The 4. stage and the level: (1) in the scope of the mine field, along the tendency of the coal seam, according to a certain elevation, the coal seam is divided into a number of paralle
文档评论(0)