- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
汕头市中考满分作文-无题(国外英文资料)
汕头市中考满分作文-无题(国外英文资料) The template construction, the workers should first be familiar with the drawings, and the beam plate according to the drawings, review content change up. The post pouring belt and the construction joint shall be carried out according to the standard. After the combination of the die, the number shall be piled up and the formwork shall be laid by numbering. The basic construction process of the project is as follows: the base plate, the foundation, the back beam, the underground, the two layer wall column, the ground layer, the beam slab, the ground wall, the column and the roof of the basement. (1) the basic principles of template design; Ensure the smoothness and rigidity of the formwork to ensure the whole effect after the concrete is released. Adopting standardized, integrated and tool oriented templates to improve work efficiency and shorten construction period. (two) supply and deployment of formwork material; The carpenter turn like staff turnover, and submit the completed template layout template (steel pipe, wood material list Zhou Fang), Zhou material list after the project material supply department responsible for the audit. By the project department according to the progress of each unit, batch entry, unified deployment. Set up strict material management system, and make saving measures to reduce material loss. The basement of this project is partly made of civil air defence basement, and some of the indoor shear walls are explosion proof walls, all of which have air tightness requirements and civil air defense requirements. On the external shear wall and column wall reinforcement 12 civil air defense pull screw should be waterproof treatment for indoor wall column, phi, pull screw only limit plate, can seal plate do not need to pull screw. To pull the screw set reinforcement shear wall template basement, according to the construction of the concrete lateral pressure calculation, pull screw should be set up according to the secret M
您可能关注的文档
最近下载
- 《Linux操作系统及应用技术》全套教学课件.pptx
- 第三单元基于算法的编程基础 第6课 生活中的算法-查找与排 说课稿 -2023-—2024学年青岛版(2024)初中信息技术第四册.docx VIP
- 普通混凝土长期性能和耐久性能试验方法标准.pdf VIP
- 中国新生儿复苏指南(2021年修订).pptx VIP
- 3m直尺平整度检测记录表.docx VIP
- 施工现场环境因素识别与评价表.xls VIP
- 2025_2026学年九年级上册数学第一次月考[陕西专用 北师大版九上:特殊四边形 一元二次方程 概率].docx VIP
- 产品售后服务体系.docx VIP
- 12SS508混凝土模块式室外给水管道附属构筑物.docx VIP
- 新02S3图集集合图.pdf VIP
文档评论(0)