- 1、本文档共19页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
气压机(国外英文资料)
气压机(国外英文资料)
I. The purpose of compiling the winter operation method of heavy pressing shop
In order to ensure a workshop in heavy oil catalytic safe produce, especially in the northern winter easy to freeze production environment, ensure the safety of production in winter, not frozen, frozen one inch pipeline and equipment. In accordance with the relevant requirements of winter safety production companies and refineries, the production characteristics of combined device, antifreeze, implement the joint anti coagulation device and heat insulation work, need to clarify the status of winter antifreeze anti coagulation function, so that workers in the winter production well documented, rule-based, winter operation law is formulated a heavy oil catalytic the workshop monitor reaction, fractionation, absorption, stable product refining, gas separation, main air unit, air compressor position, the operating personnel strictly.
Two, winter operating method of the use of the scope and execution time
1, the execution time is from October 10, 2012 to April 15, 2013.
2, the scope of application: device, refined product of 1.0Mt/a heavy oil catalytic cracking unit and supporting the two sets of gas fractionation unit, winter equipment running start and shutdown scheme, safety equipment, pipeline and scheme of winter winter emergency treatment
\
Adjustment of cooling water
According to the characteristics of winter temperature is relatively low in Daqing area, energy saving and anti freezing principle, the same line of both air cooling and water cooling, to air cooling is the main means of regulation, and to do water aid, but cooler and water side, to maintain proper opening, to prevent the generation of the cecum dead. After the adjustment of the cooler, it is necessary to meet the requirements of the circulating water flow rate in the regulations of the Daqing Petrochemical Co on industrial water management
1.2.1 cooling water temperature indicator may be relaxed in the winter,
您可能关注的文档
最近下载
- 化学品安全管理制度、岗位责任制.doc VIP
- Unit 4(复习课件)五年级英语上册(译林版三起).ppt
- 江苏省南京市六校联合体2023-2024学年高三上学期10月联合调研物理试题及答案解析.docx
- 生猪生态养殖项目可行性研究报告.doc
- 2024新疆生产建设兵团第十师北屯市医共体招聘编制备案制人员76人笔试备考题库及答案解析.docx
- 幼儿教科研课题:幼儿园数学教育途径与指导策略的研究结题工作报告.doc VIP
- 蝶变英语3500词电子版.pdf VIP
- 2023年成都设计咨询集团有限公司人员招聘考试题库含答案解析.docx
- 2021秋国家开放大学电大《毛泽东思想和中国特色社会主义体系概论》大作业终结性三套试题(含答案).pdf
- 高中英语_The Sky Railway教学课件设计.ppt
文档评论(0)